Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
1,910hours of spills in 2025 between them (typical neighbourhood: about 36)
405spill events counted
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton164 spills, 769 hours in 2025
1.6 km away
United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey118 spills, 563 hours in 2025
1.6 km away
United Utilities
Liverpool Wwtwinto Mersey Estuary · near bathing water: Wallasey60 spills, 434 hours in 2025
1.6 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton48 spills, 139 hours in 2025
1.6 km away
United Utilities
Beacons Gutter Ssointo Mersey Estuary · near bathing water: Wallasey10 spills, 4 hours in 2025
1.7 km away
United Utilities
Sandhills Lane Csointo Mersey Estuary · near bathing water: Wallasey3 spills, 1 hours in 2025
1.9 km away
United Utilities
Battery Lane Csointo The Mersey Estuary · near bathing water: Wallasey2 spills, 0 hours in 2025
1.5 km away
United Utilities
Wallasey Ww Pumping Stationinto River Mersey Estuary · near bathing water: Wallasey; Moreton0 spills, 0 hours in 2025
54 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 2.0 km away
Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025 2.4 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 2.5 km away
Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 2.5 km away
Rooftop solar
Bulk Powder Terminals, Regent Road - Solar PanelsApproved, not yet built · 700 kW
Feb 2024 2.5 km away
Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 2.6 km away
Rooftop solar
Steel Terminal, Royal Seaforth Dock - Solar PanelsApproved, not yet built
Mar 2024 2.7 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 2.9 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 2.9 km away
Rooftop solar
Waste Care, Lower Bank View - Solar PanelsApproved, not yet built · 210 kW
Feb 2025 3.0 km away
Road and street works within 1 km
3 permitted works running now or planned.
Standard
Church Lane, EgremontDisconnection or alteration of supply · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Minor
Church Lane, EgremontRemedial works · United Utilities Water Ltd · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away
Minor
Martins Lane, LiscardUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 3.0 km away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 3.0 km away
Running nearest: Burbo Bank Energy Storage (battery storage, 1.9 km); Bidston Moss Landfill Scheme (landfill gas, 3.3 km); Port of Liverpool - wind (wind farm, 3.6 km); Royal Seaforth Dock Wind Farm (wind farm, 5.0 km); Land at Carnegie Road (battery storage, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 23.5 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 29.5 km away
Decided
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.