Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
12storm overflows within 2 km
872hours of spills in 2025 between them (typical neighbourhood: about 36)
296spill events counted
United Utilities
Rear Of 25 Wheatfield Close Csointo River Fender47 spills, 258 hours in 2025
1.0 km away
United Utilities
Upton Storm Tanksinto River Fender · near bathing water: Wallasey19 spills, 194 hours in 2025
1.6 km away
United Utilities
Hoylake Road/Chapelhill Csointo River Fender · near bathing water: Moreton26 spills, 94 hours in 2025
700 m away
United Utilities
Leasowe Road Csointo Bidston Stream · near bathing water: Wallasey53 spills, 91 hours in 2025
1.8 km away
United Utilities
Sandy Lane Csointo Bidston Stream, A Trib Of The River Birket · near bathing water: Wallasey61 spills, 78 hours in 2025
1.7 km away
United Utilities
Wallacre Road Csointo Bidston Stream A Trib Of The River Birket · near bathing water: Wallasey31 spills, 56 hours in 2025
1.4 km away
United Utilities
Bidston By-Pass Csointo River Birket · near bathing water: Wallasey13 spills, 47 hours in 2025
400 m away
United Utilities
Upton Road Cso 513n8into River Fender28 spills, 42 hours in 2025
42 planned, approved or being built and 6 running (24 MW between them). Those within 5 km are on the map above.
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 700 m away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 700 m away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 950 m away
Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025 2.2 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 3.6 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 3.6 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 4.3 km away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 4.3 km away
Rooftop solar
Huskisson Dock Building, Huskisson Dock - Solar PV ArrayApproved, not yet built · 1 MW
Mar 2024 5.6 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 5.7 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
Major, planned
Bidston Bypass, BidstonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 200 m away
Major
Bidston Bypass, BidstonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Oct 2026 to Oct 2026 200 m away
Standard
Fender Lane, MoretonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 5.8 km away
Rooftop solar
Temp Control Building - Solar PanelsApproved, not yet built
Mar 2024 6.0 km away
Running nearest: Bidston Moss Landfill Scheme (landfill gas, 500 m); Burbo Bank Energy Storage (battery storage, 1.8 km); Port of Liverpool - wind (wind farm, 6.9 km); Royal Seaforth Dock Wind Farm (wind farm, 7.1 km); Bromborough Dock Landfill Scheme (landfill gas, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Decision
Frodsham SolarGenerating Stations · Land on Frodsham Marsh, approximately 500m to the north of Frodsham, Cheshire West and Chester
application due 30 May 2025 25.6 km away
Decided
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 26.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.