Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
95hours of spills in 2025 between them (typical neighbourhood: about 36)
58spill events counted
United Utilities
Noctorum Avenue Cso 512ibinto River Fender58 spills, 95 hours in 2025
30 planned, approved or being built and 6 running (22 MW between them). Those within 5 km are on the map above.
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 950 m away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 950 m away
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 1.3 km away
Solar farm
Murrayfield Hospital, Holmwood Drive - Solar PanelsApproved, not yet built · 170 kW
Jun 2023 2.6 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 4.0 km away
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 4.2 km away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 4.2 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 4.5 km away
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 5.8 km away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 5.8 km away
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
Major, planned
Waterpark Road, PrentonUtility repair and maintenance works · United Utilities Water Ltd · Road closure
Dec 2026 to Dec 2026 400 m away
Standard
Christleton Close, OxtonUtility repair and maintenance works · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 450 m away
Minor
Prenton Hall Road, PrentonUtility repair and maintenance works · United Utilities Water Ltd · Two-way signals
Dec 2026 to Dec 2026 400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 26.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.