Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
89hours of spills in 2025 between them (typical neighbourhood: about 36)
45spill events counted
United Utilities
Woodside Csointo River Mersey Estuary (Tidal) · near bathing water: Wallasey14 spills, 60 hours in 2025
2.0 km away
United Utilities
St Pauls Road Cso 332tx Pre0006into Mersey Estuary · near bathing water: Wallasey31 spills, 29 hours in 2025
49 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 1.6 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 2.2 km away
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 2.9 km away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 2.9 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 3.3 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 3.6 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 3.6 km away
Rooftop solar
Tesco SuperstoreApproved, not yet built
Apr 2021 4.0 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 4.0 km away
Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022 4.2 km away
Road and street works within 1 km
11 permitted works running now or planned, 8 of them major.
Major, planned
Union Street, TranmereWorks for Rail Purposes · NETWORK RAIL · Road closure
Jan 2027 to Jan 2027 650 m away
Major
Willmer Road, TranmereUtility asset works · CADENT GAS LIMITED · Give and take
Sept 2026 to Nov 2026 700 m away
Major, planned
Willmer Road, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 700 m away
Major
Willmer Road, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Oct 2026 to Dec 2026 700 m away
Major
Lydbrook Close, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 800 m away
Major, planned
Alison Avenue, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Apr 2026 to Nov 2026 800 m away
Major
Alison Avenue, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Apr 2026 to Nov 2026 800 m away
Major
Mount Road, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Oct 2027 900 m away
Standard
Astonwood Road, TranmereDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026 400 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Permission for 651 homesLand to the north of Pyramids Shopping centre (incorporating land north and south of Conway Street, and north-west of Europa Boulevard), Birkenhead (outline planning permission)
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 28.9 km away
Pre-application
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
application due Dec 2027 29.6 km away
Pre-application
Intermodal Logistics Park NorthRail Freight Interchanges · Site known as Intermodal Logistics Park North – land bounded by the M6 motorway (west), Winwick Lane (south and east) and Chat Moss railway line (north).
application due May 2027 29.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.