Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
89hours of spills in 2025 between them (typical neighbourhood: about 36)
45spill events counted
United Utilities
Woodside Csointo River Mersey Estuary (Tidal) · near bathing water: Wallasey14 spills, 60 hours in 2025
2.0 km away
United Utilities
St Pauls Road Cso 332tx Pre0006into Mersey Estuary · near bathing water: Wallasey31 spills, 29 hours in 2025
48 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026 1.4 km away
Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023 2.0 km away
Rooftop solar
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.3 km away
Wind farm
HMS Eaglet, Sefton Street - Wind Turbine & Solar PanelsPlanning application in
Sept 2022 3.3 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025 3.3 km away
Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025 3.3 km away
Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026 3.3 km away
Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023 3.5 km away
Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025 3.8 km away
Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026 3.8 km away
Road and street works within 1 km
11 permitted works running now or planned, 7 of them major.
Major
Willmer Road, TranmereUtility asset works · CADENT GAS LIMITED · Give and take
Sept 2026 to Nov 2026 200 m away
Major, planned
Willmer Road, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 200 m away
Major
Willmer Road, TranmereHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Oct 2026 to Dec 2026 200 m away
Major
Grange Road West, BirkenheadHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Sept 2026 to Nov 2026 650 m away
Major
Catherine Street, BirkenheadHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Aug 2026 to Oct 2026 750 m away
Major
St John Street, BirkenheadHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Aug 2026 to Oct 2026 800 m away
Major
Mount Pleasant, OxtonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Nov 2026 1000 m away
Standard
Fairview Road, OxtonHighway improvement works · WIRRAL BOROUGH COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away
Standard
Astonwood Road, TranmereDisconnection or alteration of supply · United Utilities Water Ltd · Give and take
Oct 2026 to Oct 2026850 m away
Major infrastructure projects within 30 km
Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east.
Permission for 651 homesLand to the north of Pyramids Shopping centre (incorporating land north and south of Conway Street, and north-west of Europa Boulevard), Birkenhead (outline planning permission)
Awel y Môr Offshore Wind FarmGenerating Stations · To the west of, and immediately adjacent to, the Gwynt y Môr Offshore Wind Farm.
decided Sept 2023 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.