What's changing near CH41 0BJ
Within 2 km, around Claughton North in Wirral. Building, planning, schools, transport, prices and crime.
392new homes completed within 2 km, last 2 years
50homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Claughton North, 2024 → 2025 (council +4.3%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
11 new homes completedflats · Jun 2026
Jun 2026
1.5 km away - New homes
8 new homes completedflats · Jan 2026
Jan 2026
1.5 km away - New homes
8 new homes completedhouses · Sep 2025
Sept 2025
1.7 km away - New homes
12 new homes completedflats · Jul 2025
Jul 2025
1.4 km away - New homes
88 new homes completedflats · Jan 2025
Feb 2025
1.4 km away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
1.4 km away - New homes
88 new homes completedflats · Jan 2025
Jan 2025
1.4 km away - New homes
86 new homes completedflats · Jan 2025
Jan 2025
1.5 km away - New schoolMay 2023
2.0 km away - Planning permissionOct 2021
1.3 km away - Planning permission
18homes extended 2021–2025, typically adding 15 m²
34since energy certificates began (2008)
1in CH41 0BJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
46 planned, approved or being built and 9 running (144 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Valley Road, Bidston - Solar PanelsApproved, not yet built · 170 kW
Sept 2023
1.3 km away - Rooftop solar
Tesco, Bidston Link Road, Bidston - Solar PanelsApproved, not yet built · 300 kW
Sept 2025
1.6 km away - Rooftop solar
Tesco Pharmacy, Bidston - Solar PanelsApproved, not yet built · 230 kW
May 2026
1.6 km away - Rooftop solar
Tipographic, Morpeth Wharf - Solar PV PanelsApproved, not yet built · 810 kW
May 2023
2.3 km away - Rooftop solar
Sainsburys, Woodchurch Road - Solar PanelsApproved, not yet built · 160 kW
Apr 2026
2.8 km away - Rooftop solar
St Marys College, Wallasey Village - Solar PanelsApproved, not yet built · 310 kW
Sept 2025
2.9 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 340 kW
Sept 2025
3.1 km away - Rooftop solar
Woodchurch High School, Carr Bridge Road - Solar PanelsApproved, not yet built · 490 kW
Nov 2025
3.1 km away - Rooftop solar
Port Of Liverpool Building, Mann Island - Solar PanelsApproved, not yet built
Feb 2026
3.9 km away - Rooftop solar
Mercedes-Benz, Pall Mall - Solar ArrayApproved, not yet built · 350 kW
Aug 2022
4.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major, planned
Shrewsbury Road, ClaughtonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Sept 2026 to Dec 2026
900 m away - Major
Shrewsbury Road, ClaughtonHighway repair and maintenance works · WIRRAL BOROUGH COUNCIL · Road closure
Oct 2026 to Dec 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-application
Mersey Tidal Power ProjectGenerating Stations · This will be an in-river proposal, located within the Mersey Riverine
environment. The Project will be located towards the mouth of the River
Mersey, between the Wirral on the west and Liverpool to the east. application due January 2028
3.1 km away - Decideddecided Sept 2014
13.1 km away - Decisionapplication due Q3 2025
18.3 km away - Decideddecided Mar 2024
19.1 km away - Pre-applicationapplication due April 2027
20.2 km away - Decideddecided May 2015
22.7 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Burbo Bank Energy Storage (battery storage, 1.6 km); Bidston Moss Landfill Scheme (landfill gas, 2.0 km); Port of Liverpool - wind (wind farm, 6.5 km); Bromborough Dock Landfill Scheme (landfill gas, 6.7 km); Bromborough Dock (landfill gas, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.