197new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Caerphilly East, 2024 → 2025 (council +5.4%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · May 2026 – Oct 2026
planned Oct 2026
1.7 km away - New homes
15 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.7 km away - New homes
40 new homes completed4 flats, 36 houses · Mar 2025 – Mar 2026
Mar 2026
1.7 km away - New homes
5 new homes completedhouses · Aug 2025 – Jan 2026
Jan 2026
1.6 km away - New homes
25 new homes completed4 flats, 21 houses · Nov 2024 – Jan 2026
Jan 2026
1.8 km away - New homes
39 new homes completedflats · Sep 2025 – Oct 2025
Oct 2025
1.5 km away - New homes
5 new homes completedflats · Sep 2025
Sept 2025
950 m away - New homes
6 new homes completedflats · Sep 2025
Sept 2025
1.5 km away - New homes
16 new homes completedhouses · May 2025
May 2025
1.1 km away - New homes
15 new homes completedflats · May 2025
May 2025
1.1 km away - New homes
5 new homes completedflats · Feb 2025
Feb 2025
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 28 m²
19since energy certificates began (2008)
0in CF83 3FT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
18 planned, approved or being built and 7 running (37 MW between them). Those within 5 km are on the map above.
- Solar farm
Cwm Ivor Penyrheol Solar FarmApproved, not yet built · 20 MW
May 2024
2.1 km away - Rooftop solar
Midway Retail Park - Solar Photovoltaic PanelsApproved, not yet built · 930 kW
Jun 2024
4.5 km away - Wind farm
Twyn Hywel Wind FarmApproved, not yet built · 92 MW
Nov 2024
4.6 km away - Solar farm
Maes Mawr SolarBeing built · 30 MW
Jun 2026
5.2 km away - Battery storage
Pound Farm Lane - Battery StoragePlanning application in · 200 MW
Nov 2025
5.4 km away - Solar farm
Glyntaff Solar Farm, Bryntail Road - Solar ArrayPlanning application in · 40 MW
May 2025
6.1 km away - Rooftop solar
Llanishen High SchoolApproved, not yet built · 200 kW
Mar 2019
6.2 km away - Pumped storage
Treforest Weir, Cardiff Road - Hydroelectric EnergyPlanning application in · 300 kW
Jan 2025
6.8 km away - Battery storage
National Road, Cilfynydd - Battery Energy Storage SystemPlanning application in · 200 MW
Jun 2025
8.1 km away - Rooftop solar
Spire Cardiff Hospital, Croescadarn Road - Solar PanelsApproved, not yet built · 170 kW
Jul 2024
8.2 km away - Wind farm
Llanwonno - Wind Farm
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due November 2026
26.5 km away - Decideddecided Jul 2015
28.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Maes Bach Farm (solar farm, 4.9 km); Cwmcaesingrug Farm (solar farm, 7.1 km); Berthlwyd Farm (solar farm, 7.3 km); Penrhiwarwydd Farm (solar farm, 7.3 km); Newport (Began Road) (solar farm, 9.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.