What's changing near CF72 9UQ
Within 2 km, around Bryn-cae & Llanharan in Rhondda Cynon Taf. Building, planning, schools, transport, prices and crime.
390new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in Bryn-cae & Llanharan, 2024 → 2025 (council +4.5%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
26 new homes completedhouses · Dec 2024 – Oct 2026
Oct 2026
900 m away - New homes
29 new homes completedhouses · Apr 2025 – Sep 2026
Sept 2026
1.2 km away - New homes
11 new homes completedhouses · Jun 2025 – Jul 2026
Jul 2026
1.1 km away - New homes
23 new homes completedhouses · Dec 2024 – Jun 2026
Jun 2026
800 m away - New homes
19 new homes completedhouses · May 2026 – Jun 2026
Jun 2026
1.2 km away - New homes
23 new homes completedhouses · Apr 2025 – Apr 2026
Apr 2026
1.0 km away - New homes
44 new homes completedhouses · Jun 2025 – Mar 2026
Mar 2026
1.2 km away - New homes
26 new homes completed6 flats, 20 houses · Dec 2024 – Mar 2026
Mar 2026
1.2 km away - New homes
20 new homes completedhouses · Jun 2025 – Mar 2026
Mar 2026
1.0 km away - New homes
25 new homes completedhouses · Nov 2024 – Dec 2025
Dec 2025
1.0 km away - New homes
38 new homes completed12 flats, 26 houses · May 2025 – Dec 2025
Dec 2025
1.1 km away - New homes
14 new homes completedhouses · Dec 2024 – Nov 2025
Nov 2025900 m away
13homes extended 2021–2025, typically adding 23 m²
20since energy certificates began (2008)
2in CF72 9UQ itself
- Extendedcertificate 2025
- Extendedcertificate 2024
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 15 running (149 MW between them). Those within 5 km are on the map above.
- Solar farm
Whitehall Farm, Llanharry Road - Solar PV PanelsBeing built · 1 MW
Apr 2025
1.4 km away - Solar farm
Hendir Uchaf Farm, Minffrwd Road - Solar ArrayPlanning application in · 2 MW
Dec 2025
2.8 km away - Solar farm
Dyffryn Farm, Ynysmaerdy - Solar PanelsPlanning application in · 10 MW
Dec 2025
3.8 km away - Battery storage
Coedcae Industrial Estate, Talbot Green - Micro Energy Storage SystemsPlanning application in · 200 kW
Jan 2026
3.9 km away - Solar farm
Coed Ely - Solar FarmBeing built · 6 MW
Dec 2024
4.1 km away - Solar farm
Talbot Green, Llantrisant - Solar FarmApproved, not yet built · 10 MW
Apr 2024
4.6 km away - Solar farm
Rhiwfelin Fach Farm, Ynysmaerdy - Solar Photovoltaic PanelsApproved, not yet built · 500 kW
Mar 2022
4.9 km away - Solar farm
Ty’n y Waun - Solar Farm (Bridgend Energy Hub)Approved, not yet built · 40 MW
Oct 2024
5.1 km away - Solar farm
Treoes - Solar FarmApproved, not yet built
Oct 2025
5.3 km away - Rooftop solar
SAS International, Unit 1 - Solar PV PanelsBeing built · 800 kW
May 2022
7.4 km away - Rooftop solar
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Dec 2015
23.0 km away - Decideddecided Jul 2015
24.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Agricultural Land at Trecastle (solar farm, 2.0 km); Mynydd Portref (wind farm, 2.5 km); Mynydd Portref Wind Farm extension (wind farm, 2.8 km); Graig Fatha Farm (wind farm, 3.0 km); Taff Ely Wind Farm (wind farm, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.