Country England and Wales › Region East of England › Council West Suffolk › Neighbourhood Haverhill West › Postcode CB9 9QQ What's changing near CB9 9QQ Within 2 km, around Haverhill West in West Suffolk. Building, planning, schools, transport, prices and crime.
84 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+5.2% like-for-like prices in Haverhill West, 2024 → 2025 (council +1.2%)
-1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 13 new homes completed 12 flats, 1 houses · Apr 2026 – Sep 2026
Sept 2026 750 m away New homes 7 new homes completed 5 flats, 2 houses · Aug 2025 – Nov 2025
Nov 2025 1.8 km away New homes 34 new homes completed flats · May 2025 – Aug 2025
Aug 2025 1.5 km away New homes 15 new homes completed 1 flats, 14 houses · Nov 2024 – Jul 2025
Jul 2025 1.9 km away New homes 6 new homes completed houses · Dec 2024
Dec 2024 1.9 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 29 m²
12 since energy certificates began (2008)
1 in CB9 9QQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 10 planned, approved or being built and 2 running (34 MW between them). Those within 5 km are on the map above.
Rooftop solar Sainsburys Superstore, Haycocks Road - Solar Panels Approved, not yet built · 310 kW
Apr 2026 650 m away Battery storage Homefield Road - Micro Energy Storage Facility Approved, not yet built · 200 kW
Aug 2024 1.8 km away Rooftop solar Herbert Retail, Rookwood Way - Solar Photovoltaic Panels Approved, not yet built
Jul 2025 1.9 km away Rooftop solar Samuel Ward Academy - Solar Panels Approved, not yet built · 210 kW
Nov 2025 2.5 km away Battery storage Haverhill Road, Little Wratting - Micro Energy Storage Approved, not yet built · 200 kW
Jan 2026 4.1 km away Anaerobic digestion Streetly Hall Farm, West Wickham - Anaerobic Digestion Renewable Energy Facility Approved, not yet built · 7 MW
Jul 2024 4.6 km away Solar farm Surmer Hall, Church Walk - Solar Farm & Battery Storage Approved, not yet built · 36 MW
Dec 2024 5.1 km away Battery storage Surmer Hall, Church Walk - Solar Farm & Battery Storage Approved, not yet built · 22 MW
Dec 2024 5.1 km away Rooftop solar Streetly Hall Farm, Webbs Road - Solar Panels Approved, not yet built · 220 kW
Sept 2025 5.4 km away Solar farm Water Hall Farm, Waterhall Road - Solar Farm Approved, not yet built · 35 MW
Jul 2025 5.9 km away Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major Betony Walk, Haverhill Utility asset works · CADENT GAS LIMITED · No carriageway incursion
Nov 2026 to Feb 2027 300 m away Major Chimswell Way, Haverhill Utility asset works · CADENT GAS LIMITED · Some carriageway incursion
Nov 2026 to Nov 2026 350 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026 10.9 km away Decided Sunnica Energy Farm Generating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington decided Jul 2024 21.5 km away Decided decided Apr 2025 22.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rookwood Way - Solar Farm (solar farm, 2.0 km); Broxted Solar Farm (Stradishall Airfield) (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.