Country England and Wales › Region East of England › Council East Cambridgeshire › Neighbourhood Haddenham, Stretham & Witchford › Postcode CB6 3UG What's changing near CB6 3UG Within 2 km, around Haddenham, Stretham & Witchford in East Cambridgeshire. Building, planning, schools, transport, prices and crime.
79 new homes completed within 2 km, last 2 years
42 homes given permission on brownfield sites since 2021
+0.5% like-for-like prices in Haddenham, Stretham & Witchford, 2024 → 2025 (council +1.7%)
+20% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 28 new homes completed houses · Sep 2025 – Dec 2025
Dec 2025 850 m away New homes 6 new homes completed houses · Sep 2025 – Dec 2025
Dec 2025 850 m away New homes 15 new homes completed houses · Nov 2025
Nov 2025 1.5 km away New homes 25 new homes completed houses · Nov 2025
Nov 2025 1.6 km away Planning permission Mar 2022 1.5 km away Planning permission Permission for 2 homes Perry Rise 34 Haddenham Road Wilburton Ely Cambridgeshire CB6 3RG (full planning permission) Feb 2021 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
8 homes extended 2021–2025, typically adding 25 m²
25 since energy certificates began (2008)
2 in CB6 3UG itself
Extended certificate 2014 Extended certificate 2011 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
225 hours of spills in 2025 between them (typical neighbourhood: about 36)
38 spill events counted
Anglian Water Station Rd Ps Haddenham into Trib Grunty Fen Drain 23 spills, 132 hours in 2025
1.6 km away Anglian Water Haddenham - New Town Road Ps into Tributary Of The Hundred Foot 12 spills, 89 hours in 2025
650 m away Anglian Water Ps Hill Row into Old West River 2 spills, 4 hours in 2025
1.7 km away Anglian Water Haddenham Sewage Treatment Works into Aldreth Canal 1 spills, 0 hours in 2025
950 m away Anglian Water Haddenham Sewage Treatment Works into Aldreth Canal 0 spills, 0 hours in 2025
950 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 10 running (135 MW between them). Those within 5 km are on the map above.
Rooftop solar The Harbour School, Station Road - Solar Panels & ASHP Approved, not yet built · 900 kW
Nov 2022 2.5 km away Rooftop solar Willow Hall Farm, Hillrow Causeway - Solar Panels Approved, not yet built · 150 kW
Aug 2025 3.9 km away Solar farm Chittering Solar Farm - extension 2 Approved, not yet built · 10 MW
Jun 2015 6.7 km away Battery storage Sewage Pumping Station - Micro Energy Storage Approved, not yet built · 200 kW
Sept 2024 6.8 km away Rooftop solar Cambridge Commodities, Lancaster Way Business Park - Solar Panels Approved, not yet built · 210 kW
Jan 2024 6.8 km away Solar farm Cambridge Waste Management Park - Solar Farm Approved, not yet built
Nov 2025 7.2 km away Rooftop solar Lees Packhouse, The Gault - Solar PV System Approved, not yet built · 270 kW
Jun 2023 7.3 km away Rooftop solar Bridge Farm, Drove Colne - Solar PV Panels Approved, not yet built · 200 kW
Nov 2025 8.2 km away Battery storage Wicken Bridleway, Church Road - Battery Energy Storage Approved, not yet built · 400 MW
Apr 2026 9.5 km away Anaerobic digestion Iretons Way Anaerobic Digester Plant Extension Approved, not yet built
Apr 2021 9.7 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Pre-application application due July 2027 8.3 km away Decided decided Apr 2025 14.1 km away Decided decided May 2016 14.2 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 14.8 km away Pre-application application due July 2027 21.3 km away Decided Sunnica Energy Farm Generating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington decided Jul 2024 21.6 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Mingay Farm (solar farm, 1.6 km); Mingay Farm - extension (solar farm, 2.0 km); Elean Business Park Biomass Plant (biomass, 5.2 km); Stowbridge Farm (solar farm, 5.6 km); Stowbridge Farm - Extension (Phase 2) (solar farm, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.