Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
209hours of spills in 2025 between them (typical neighbourhood: about 36)
23spill events counted
Anglian Water
Mepal Stwinto 100 Foot River23 spills, 209 hours in 2025
10 planned, approved or being built and 6 running (85 MW between them). Those within 5 km are on the map above.
Rooftop solar
Lees Packhouse, The Gault - Solar PV SystemApproved, not yet built · 270 kW
Jun 2023 2.4 km away
Anaerobic digestion
Iretons Way Anaerobic Digester Plant ExtensionApproved, not yet built
Apr 2021 3.7 km away
Rooftop solar
Willow Hall Farm, Hillrow Causeway - Solar PanelsApproved, not yet built · 150 kW
Aug 2025 5.5 km away
Rooftop solar
Colne Fen Farm, Chatteris Road - Solar PanelsApproved, not yet built · 500 kW
Apr 2024 7.0 km away
Rooftop solar
The Harbour School, Station Road - Solar Panels & ASHPApproved, not yet built · 900 kW
Nov 2022 7.1 km away
Rooftop solar
Bartlett Business Park - Solar PanelsApproved, not yet built · 2 MW
May 2026 7.3 km away
Rooftop solar
Cambridge Commodities, Lancaster Way Business Park - Solar PanelsApproved, not yet built · 210 kW
Jan 2024 7.5 km away
Rooftop solar
Bridge Farm, Drove Colne - Solar PV PanelsApproved, not yet built · 200 kW
Nov 2025 8.0 km away
Battery storage
Wicken Bridleway, Church Road - Battery Energy StorageApproved, not yet built · 400 MW
Apr 2026 9.5 km away
Rooftop solar
The Cloisters - Solar PanelsApproved, not yet built
Jun 2023 9.8 km away
Running nearest: Elean Business Park Biomass Plant (biomass, 1.2 km); Mepal CHP (anaerobic digestion, 3.3 km); Alan Bartlett & Sons Solar (rooftop solar, 7.5 km); Mingay Farm (solar farm, 7.6 km); Land East Of Honeysome Road (solar farm, 7.8 km).
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 4.9 km away
Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.