Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
40hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Anglian Water
Cambridge Water Recycling Centreinto The River Cam4 spills, 40 hours in 2025
1.7 km away
Anglian Water
Cambridge Riverside 187 Csointo River Cam0 spills, 0 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Kings College, West Road - Solar Photovoltaic panelsApproved, not yet built
Dec 2025 4.1 km away
Rooftop solar
New Road, Impington - Solar panelsApproved, not yet built · 280 kW
May 2024 4.6 km away
Running nearest: Milton Landfill Site (landfill gas, 2.6 km); Great Wilbraham Solar Farm (solar farm, 8.0 km); Cantelupe Solar Farm (solar farm, 8.4 km); Ely Road Waste Management Park (solar farm, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The project starts at A1/A421 Junction, Black Cat roundabout and finishes at A428/A1198 junction
decided Aug 2022 24.7 km away
Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
application due September 2028 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.