Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
5spill events counted
Anglian Water
Tunbridge La Psinto Trib Of Swaffham Bulbeck Lode1 spills, 3 hours in 2025
1.5 km away
Anglian Water
Bottisham Water Recycling Centreinto Swaffham Bulbeck Lode4 spills, 2 hours in 2025
Coldhams Business Park, Norman Way - Solar PanelsApproved, not yet built · 500 kW
Mar 2024 7.4 km away
Running nearest: Great Wilbraham Solar Farm (solar farm, 6.2 km); Milton Landfill Site (landfill gas, 6.3 km); Burwell - Battery Storage (battery storage, 6.4 km); Exning (solar farm, 6.9 km); Goosehall Solar Farm (solar farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Located near Shippea Hill, in East Anglia.
application due July 2027 26.0 km away
Pre-application
Fens ReservoirDams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
application due September 2028 29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.