Country England and Wales › Region East of England › Council South Cambridgeshire › Neighbourhood HIston, Impington & Orchard Park › Postcode CB24 9ZT What's changing near CB24 9ZT Within 2 km, around HIston, Impington & Orchard Park in South Cambridgeshire. Building, planning, schools, transport, prices and crime.
418 new homes completed within 2 km, last 2 years
88 homes given permission on brownfield sites since 2021
+2.3% like-for-like prices in HIston, Impington & Orchard Park, 2024 → 2025 (council +1.0%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed 7 flats, 9 houses · Nov 2025 – Oct 2026
Oct 2026 1.5 km away New homes 54 new homes completed 52 flats, 2 houses · Jun 2025 – Sep 2026
Sept 2026 1.4 km away New homes 16 new homes completed flats · Nov 2025 – Sep 2026
Sept 2026 1.8 km away New homes 38 new homes completed 34 flats, 4 houses · May 2025 – Aug 2026
Aug 2026 1.9 km away New homes 12 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.6 km away New homes 10 new homes completed houses · Mar 2026 – Jul 2026
Jul 2026 1.6 km away New homes 16 new homes completed houses · Nov 2025 – Jul 2026
Jul 2026 1.5 km away New homes 47 new homes completed 27 flats, 20 houses · Sep 2025 – Jul 2026
Jul 2026 1.9 km away New homes 11 new homes completed 5 flats, 6 houses · Nov 2025 – Jul 2026
Jul 2026 1.9 km away New homes 7 new homes completed 2 flats, 5 houses · May 2026 – Jul 2026
Jul 2026 1.5 km away New homes 24 new homes completed 11 flats, 13 houses · Dec 2024 – May 2026
May 2026 1.4 km away New homes 30 new homes completed 14 flats, 16 houses · Sep 2025 – Feb 2026
13 homes extended 2021–2025, typically adding 28 m²
28 since energy certificates began (2008)
1 in CB24 9ZT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 22 planned, approved or being built and 3 running (8 MW between them). Those within 5 km are on the map above.
Rooftop solar New Road, Impington - Solar panels Approved, not yet built · 280 kW
May 2024 400 m away Rooftop solar CRM Surgical, 1 Evolution Business Park - Solar Panels Approved, not yet built · 800 kW
Apr 2022 2.2 km away Rooftop solar St Andrews Street - Roof mounted solar panels Approved, not yet built · 150 kW
Jun 2022 4.0 km away Rooftop solar Levidian Nanosystems, Levidian Technology Centre - Solar Panels Planning application in · 180 kW
Dec 2022 4.0 km away Rooftop solar Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels Approved, not yet built · 330 kW
Aug 2023 4.2 km away Rooftop solar Kings College, West Road - Solar Photovoltaic panels Approved, not yet built
Dec 2025 4.2 km away Rooftop solar Coton Orchard Garden Centre, Cambridge Road - Solar Panels Approved, not yet built · 210 kW
Jan 2023 4.6 km away Rooftop solar Cambridge Parkside Pool Approved, not yet built
Aug 2021 4.7 km away Solar farm Low Fen, Drove Way - Solar Farm Planning application in · 50 MW
Mar 2025 5.1 km away Battery storage Low Fen, Drove Way - Energy Storage System Planning application in
Mar 2025 5.1 km away Road and street works within 1 km 2 permitted works running now or planned, 2 of them major.
Major Villa Road, Impington Utility asset works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Nov 2026 350 m away Major New Road, Impington Utility repair and maintenance works · CAMBRIDGE WATER COMPANY · Road closure
Oct 2026 to Oct 2026 500 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 5.7 km away Decided decided May 2016 10.1 km away Pre-application application due August 2027 14.8 km away Pre-application Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026 16.1 km away Pre-application application due July 2027 18.0 km away Decided decided Aug 2022 21.0 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Milton Landfill Site (landfill gas, 3.1 km); Ely Road Waste Management Park (solar farm, 7.8 km); Cantelupe Solar Farm (solar farm, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.