What's changing near CB24 9PE
Within 2 km, around HIston, Impington & Orchard Park in South Cambridgeshire. Building, planning, schools, transport, prices and crime.
464new homes completed within 2 km, last 2 years
88homes given permission on brownfield sites since 2021
+2.3%like-for-like prices in HIston, Impington & Orchard Park, 2024 → 2025 (council +1.0%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
8 new homes completed2 flats, 6 houses · May 2026 – Oct 2026
planned Oct 2026
1.3 km away - New homes
16 new homes completed7 flats, 9 houses · Nov 2025 – Oct 2026
Oct 2026
1.2 km away - New homes
54 new homes completed52 flats, 2 houses · Jun 2025 – Sep 2026
Sept 2026
1.2 km away - New homes
16 new homes completedflats · Nov 2025 – Sep 2026
Sept 2026
1.5 km away - New homes
38 new homes completed34 flats, 4 houses · May 2025 – Aug 2026
Aug 2026
1.6 km away - New homes
12 new homes completedhouses · Mar 2026 – Aug 2026
Aug 2026
1.4 km away - New homes
10 new homes completedhouses · Mar 2026 – Jul 2026
Jul 2026
1.4 km away - New homes
16 new homes completedhouses · Nov 2025 – Jul 2026
Jul 2026
1.3 km away - New homes
47 new homes completed27 flats, 20 houses · Sep 2025 – Jul 2026
Jul 2026
1.6 km away - New homes
11 new homes completed5 flats, 6 houses · Nov 2025 – Jul 2026
Jul 2026
1.6 km away - New homes
21 new homes completed1 flats, 20 houses · Mar 2025 – Jun 2026
Jun 2026
2.0 km away - New homes
24 new homes completed11 flats, 13 houses · Dec 2024 – May 2026
9homes extended 2021–2025, typically adding 28 m²
20since energy certificates began (2008)
0in CB24 9PE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 3 running (8 MW between them). Those within 5 km are on the map above.
- Rooftop solar
New Road, Impington - Solar panelsApproved, not yet built · 280 kW
May 2024
700 m away - Rooftop solar
CRM Surgical, 1 Evolution Business Park - Solar PanelsApproved, not yet built · 800 kW
Apr 2022
2.5 km away - Rooftop solar
St Andrews Street - Roof mounted solar panelsApproved, not yet built · 150 kW
Jun 2022
3.8 km away - Rooftop solar
Levidian Nanosystems, Levidian Technology Centre - Solar PanelsPlanning application in · 180 kW
Dec 2022
4.0 km away - Rooftop solar
Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panelsApproved, not yet built · 330 kW
Aug 2023
4.0 km away - Rooftop solar
Kings College, West Road - Solar Photovoltaic panelsApproved, not yet built
Dec 2025
4.0 km away - Rooftop solar
Coton Orchard Garden Centre, Cambridge Road - Solar PanelsApproved, not yet built · 210 kW
Jan 2023
4.3 km away - Rooftop solar
Cambridge Parkside PoolApproved, not yet built
Aug 2021
4.6 km away - Solar farm
Low Fen, Drove Way - Solar FarmPlanning application in · 50 MW
Mar 2025
5.2 km away - Battery storage
Low Fen, Drove Way - Energy Storage SystemPlanning application in
Mar 2025
5.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major
Villa Road, ImpingtonUtility asset works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Nov 2026
450 m away - Major
New Road, ImpingtonUtility repair and maintenance works · CAMBRIDGE WATER COMPANY · Road closure
Oct 2026 to Oct 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Apr 2025
5.8 km away - Decideddecided May 2016
10.0 km away - Pre-applicationapplication due August 2027
14.6 km away - Pre-application
Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026
16.1 km away - Pre-applicationapplication due July 2027
18.1 km away - Decideddecided Aug 2022
20.8 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Milton Landfill Site (landfill gas, 3.3 km); Cantelupe Solar Farm (solar farm, 8.0 km); Ely Road Waste Management Park (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.