Country England and Wales › Region East of England › Council South Cambridgeshire › Neighbourhood HIston, Impington & Orchard Park › Postcode CB24 9HN What's changing near CB24 9HN Within 2 km, around HIston, Impington & Orchard Park in South Cambridgeshire. Building, planning, schools, transport, prices and crime.
6 new homes completed within 2 km, last 2 years
40 homes given permission on brownfield sites since 2021
+2.3% like-for-like prices in HIston, Impington & Orchard Park, 2024 → 2025 (council +1.0%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Jun 2022 1.5 km away New school Nov 2021 1.6 km away Planning permission Oct 2021 250 m away New school Sept 2021 1.1 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 30 m²
13 since energy certificates began (2008)
1 in CB24 9HN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 21 planned, approved or being built and 5 running (34 MW between them). Those within 5 km are on the map above.
Rooftop solar New Road, Impington - Solar panels Approved, not yet built · 280 kW
May 2024 1.2 km away Rooftop solar CRM Surgical, 1 Evolution Business Park - Solar Panels Approved, not yet built · 800 kW
Apr 2022 2.1 km away Battery storage Sewage Pumping Station - Micro Energy Storage Approved, not yet built · 200 kW
Sept 2024 4.2 km away Solar farm Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage Planning application in · 26 MW
Jun 2025 5.0 km away Battery storage Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage Planning application in · 20 MW
Jun 2025 5.0 km away Rooftop solar Levidian Nanosystems, Levidian Technology Centre - Solar Panels Planning application in · 180 kW
Dec 2022 5.2 km away Rooftop solar St Andrews Street - Roof mounted solar panels Approved, not yet built · 150 kW
Jun 2022 5.5 km away Solar farm Cambridge Waste Management Park - Solar Farm Approved, not yet built
Nov 2025 5.6 km away Rooftop solar Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels Approved, not yet built · 330 kW
Aug 2023 5.7 km away Rooftop solar Kings College, West Road - Solar Photovoltaic panels Approved, not yet built
Dec 2025 5.8 km away Road and street works within 1 km 6 permitted works running now or planned, 4 of them major.
Major Mill Lane, Histon Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Nov 2026 200 m away Major, planned Access Road To Histon County Junior School From The Green, Histon Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Dec 2026 500 m away Major Access Road To Histon County Junior School From The Green, Histon Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Dec 2026 500 m away Major Home Close, Histon Utility asset works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Oct 2026 750 m away Standard The Green, Histon Utility asset works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Oct 2026 to Oct 2026 550 m away Standard High Street, Histon Utility asset works · CITYFIBRE METRO NETWORKS LTD · Multi-way signals
Oct 2026 to Oct 2026 600 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 6.1 km away Decided decided May 2016 9.7 km away Pre-application application due August 2027 15.2 km away Pre-application application due July 2027 16.5 km away Pre-application Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026 17.2 km away Decided decided Aug 2022 21.3 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Milton Landfill Site (landfill gas, 3.4 km); Ely Road Waste Management Park (solar farm, 6.6 km); Mingay Farm - extension (solar farm, 9.3 km); Cantelupe Solar Farm (solar farm, 9.8 km); Chittering Solar Farm Extension (solar farm, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.