Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
138hours of spills in 2025 between them (typical neighbourhood: about 36)
14spill events counted
Anglian Water
Over Water Recycling Centreinto Dockerell Brook River Great Ou11 spills, 124 hours in 2025
1000 m away
Anglian Water
Over Fen Roadinto Dockerel Brook3 spills, 15 hours in 2025
Stargoose Farm - Solar FarmApproved, not yet built · 50 MW
Apr 2022 8.2 km away
Battery storage
Stargoose Farm - Battery StorageApproved, not yet built · 312 MW
Apr 2022 8.2 km away
Running nearest: Wiggin Hill Solar Farm - Phase 1 (solar farm, 8.2 km); Wiggin Hill Solar Farm - Phase 2 (solar farm, 8.3 km); Mingay Farm - extension (solar farm, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting.
application due October 2026 26.0 km away
Recommendation
East Park EnergyGenerating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station.
application due September 2025 28.3 km away
Decided
Sunnica Energy FarmGenerating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington
decided Jul 2024 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.