135 new homes completed within 2 km, last 2 years
1 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Willingham & Over, 2024 → 2025 (council +1.0%)
+32% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 26 new homes completed houses · Feb 2026 – Mar 2026
Mar 2026 650 m away New homes 19 new homes completed 6 flats, 13 houses · Jul 2025 – Jan 2026
Jan 2026 1.8 km away New homes 21 new homes completed 8 flats, 13 houses · Mar 2025 – Dec 2025
Dec 2025 1.8 km away New homes 13 new homes completed 6 flats, 7 houses · Oct 2024 – Nov 2025
Nov 2025 1.9 km away New homes 25 new homes completed houses · Jul 2025
Jul 2025 1.8 km away New homes 18 new homes completed 2 flats, 16 houses · Dec 2024 – Apr 2025
Apr 2025 1.8 km away New homes 7 new homes completed flats · Nov 2024
Nov 2024 1.9 km away Planning permission Sept 2022 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 10 postcodes nearby had new homes completed in the last two years.
2 homes extended 2021–2025, typically adding 76 m²
3 since energy certificates began (2008)
2 in CB24 5HG itself
Extended certificate 2023 Extended certificate 2020 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 3 running (25 MW between them). Those within 5 km are on the map above.
Solar farm Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage Planning application in · 26 MW
Jun 2025 3.0 km away Battery storage Falcon Park, Wilsons Road - Solar Farm & Battery Energy Storage Planning application in · 20 MW
Jun 2025 3.0 km away Battery storage Sewage Pumping Station - Micro Energy Storage Approved, not yet built · 200 kW
Sept 2024 5.0 km away Rooftop solar Domino House, Trafalgar Way - Solar panels Approved, not yet built · 300 kW
Mar 2024 5.7 km away Rooftop solar Willow Hall Farm, Hillrow Causeway - Solar Panels Approved, not yet built · 150 kW
Aug 2025 7.0 km away Rooftop solar Bridge Farm, Drove Colne - Solar PV Panels Approved, not yet built · 200 kW
Nov 2025 7.1 km away Rooftop solar Needingworth Road - Solar Photovoltaic Array Approved, not yet built · 370 kW
Jan 2022 7.6 km away Rooftop solar New Road, Impington - Solar panels Approved, not yet built · 280 kW
May 2024 7.8 km away Solar farm Stargoose Farm - Solar Farm Approved, not yet built · 50 MW
Apr 2022 8.1 km away Battery storage Stargoose Farm - Battery Storage Approved, not yet built · 312 MW
Apr 2022 8.1 km away Road and street works within 1 km 5 permitted works running now or planned, 4 of them major.
Major, planned Balland Field, Willingham Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Nov 2026 500 m away Major Balland Field, Willingham Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Nov 2026 500 m away Major, planned Newington, Willingham Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Nov 2026 850 m away Major Newington, Willingham Utility asset works · CITYFIBRE METRO NETWORKS LTD · Road closure
Nov 2026 to Nov 2026 850 m away Minor High Street, Willingham Utility asset works · VIRGIN MEDIA · Two-way signals
Oct 2026 to Oct 2026 500 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2016 6.0 km away Pre-application application due July 2027 10.6 km away Decided decided Apr 2025 12.6 km away Pre-application application due August 2027 14.0 km away Decided decided Aug 2022 19.2 km away Pre-application Fens Reservoir Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington application due September 2028 19.5 km away Pre-application Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Mingay Farm - extension (solar farm, 7.9 km); Ely Road Waste Management Park (solar farm, 8.7 km); Mingay Farm (solar farm, 9.0 km).