Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
124hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Anglian Water
Over Water Recycling Centreinto Dockerell Brook River Great Ou11 spills, 124 hours in 2025
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting.
application due October 2026 24.6 km away
Decided
Sunnica Energy FarmGenerating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington
decided Jul 2024 26.6 km away
Pre-application
Redmere Wind FarmGenerating Stations · Located near Shippea Hill, in East Anglia.
application due July 2027 29.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.