Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
Sewage Pumping Station - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2024 8.5 km away
Rooftop solar
3-5 Stirling Way, Papworth Everard - Solar PV PanelsApproved, not yet built · 200 kW
Apr 2023 9.2 km away
Running nearest: Wiggin Hill Solar Farm - Phase 1 (solar farm, 8.7 km); Wiggin Hill Solar Farm - Phase 2 (solar farm, 8.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting.
application due October 2026 25.6 km away
Recommendation
East Park EnergyGenerating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station.
application due September 2025 26.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.