Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Dams and Reservoirs · 2km north of Chatteris and south west of the villages of Doddington and Wimblington
application due September 2028 26.6 km away
Recommendation
East Park EnergyGenerating Stations · Land between Hail Weston and Swineshead. With grid connection to the Eaton Socon sub-station.
application due September 2025 27.8 km away
Decided
Sunnica Energy FarmGenerating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington
decided Jul 2024 28.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.