Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
383hours of spills in 2025 between them (typical neighbourhood: about 36)
30spill events counted
Anglian Water
Haslingfield Wrcinto River Rhee Nt30 spills, 383 hours in 2025
Coldhams Business Park, Norman Way - Solar PanelsApproved, not yet built · 500 kW
Mar 2024 7.8 km away
Rooftop solar
Coldhams Business Park, Norman Way - Solar PanelsPlanning application in · 200 kW
Apr 2026 7.9 km away
Running nearest: Cantelupe Solar Farm (solar farm, 3.4 km); Black Peak Farm (solar farm, 7.8 km); Hoback Farm (solar farm, 8.4 km); Lamp Hill Wimpole Estate (solar farm, 8.7 km); Bury Lane Fruit Farm (solar farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Chatteris Wind FarmGenerating Stations · Located south of Chatteris, in East Anglia
application due July 2027 28.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.