Country England and Wales › Region East of England › Council South Cambridgeshire › Neighbourhood Little Shelford , Foxton & Haslingfield › Postcode CB22 7NN What's changing near CB22 7NN Within 2 km, around Little Shelford , Foxton & Haslingfield in South Cambridgeshire. Building, planning, schools, transport, prices and crime.
14 new homes completed within 2 km, last 2 years
40 homes given permission on brownfield sites since 2021
-0.6% like-for-like prices in Little Shelford , Foxton & Haslingfield, 2024 → 2025 (council +1.0%)
-5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
1 homes extended 2021–2025, typically adding 19 m²
3 since energy certificates began (2008)
1 in CB22 7NN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 6 running (106 MW between them). Those within 5 km are on the map above.
Solar farm Barton Road, Barton - Solar Farm Approved, not yet built · 5 MW
Aug 2023 4.5 km away Rooftop solar Malton Golf Club, Malton Road - Solar Panels Approved, not yet built · 410 kW
Jan 2026 5.3 km away Rooftop solar Cambridge Assesment, Whittlesford - Solar PV Array Approved, not yet built
Sept 2025 6.0 km away Rooftop solar Cambridge University Hospital, Hills Road - Solar PV Panels Approved, not yet built
Jan 2026 6.2 km away Rooftop solar Kings College, West Road - Solar Photovoltaic panels Approved, not yet built
Dec 2025 7.8 km away Rooftop solar Cambridge Parkside Pool Approved, not yet built
Aug 2021 8.1 km away Rooftop solar Lion Yard Shopping Centre, Lion Yard - Solar photovoltaic panels Approved, not yet built · 330 kW
Aug 2023 8.1 km away Rooftop solar Coton Orchard Garden Centre, Cambridge Road - Solar Panels Approved, not yet built · 210 kW
Jan 2023 8.2 km away Rooftop solar St Andrews Street - Roof mounted solar panels Approved, not yet built · 150 kW
Jun 2022 8.4 km away Rooftop solar St Bedes Inter-Church School Approved, not yet built · 1 MW
Mar 2019 8.4 km away Solar farm Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned Church Street, Harston Highway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 200 m away Standard Royston Road, Harston Utility asset works · CADENT GAS LIMITED · Two-way signals
Oct 2026 to Nov 2026 300 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Apr 2025 12.9 km away Pre-application Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026 14.3 km away Pre-application application due August 2027 15.5 km away Decided decided May 2016 17.1 km away Decided decided Aug 2022 20.9 km away Pre-application application due July 2027 29.2 km away Decided
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Cantelupe Solar Farm (solar farm, 3.9 km); Black Peak Farm (solar farm, 6.8 km); Hoback Farm (solar farm, 7.4 km); Lamp Hill Wimpole Estate (solar farm, 7.8 km); Bury Lane Fruit Farm (solar farm, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.