Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Newmarket Road, Bottisham - Battery Energy StorageApproved, not yet built · 50 MW
Dec 2023 6.3 km away
Rooftop solar
St Andrews Street - Roof mounted solar panelsApproved, not yet built · 150 kW
Jun 2022 6.8 km away
Running nearest: Great Wilbraham Solar Farm (solar farm, 3.9 km); Wadlow Wind Farm (wind farm, 7.2 km); Milton Landfill Site (landfill gas, 7.8 km); Cantelupe Solar Farm (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Major, planned
Manor Walk, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 750 m away
Major
Manor Walk, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Highways · The project starts at A1/A421 Junction, Black Cat roundabout and finishes at A428/A1198 junction
decided Aug 2022 28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.