What's changing near CB21 5BH
Within 2 km, around Fulbourn & Teversham in South Cambridgeshire. Building, planning, schools, transport, prices and crime.
160new homes completed within 2 km, last 2 years
214homes given permission on brownfield sites since 2021
-2.1%like-for-like prices in Fulbourn & Teversham, 2024 → 2025 (council +1.0%)
+36%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
50 new homes completed4 flats, 46 houses · Nov 2024 – Sep 2026
Sept 2026
1.5 km away - New homes
26 new homes completed10 flats, 16 houses · Jun 2025 – Sep 2026
Sept 2026
750 m away - New homes
13 new homes completed5 flats, 8 houses · Dec 2025 – May 2026
May 2026
1.5 km away - New homes
35 new homes completed7 flats, 28 houses · Nov 2024 – Feb 2026
Feb 2026
900 m away - New homes
22 new homes completed15 flats, 7 houses · Dec 2024 – Oct 2025
Oct 2025
950 m away - New homes
7 new homes completedhouses · Mar 2025 – Aug 2025
Aug 2025
1.5 km away - Planning permission
Permission for 11 homesHannah Reed And Associates Telford House 76 Cow Lane Fulbourn Cambridge Cambridgeshire CB21 5HB (other) Sept 2022
800 m away - Planning permission
Permission for 203 homesIda Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE (reserved matters approval) Apr 2022
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 73 m²
18since energy certificates began (2008)
0in CB21 5BH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 3 running (66 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Coldhams Business Park, Norman Way - Solar PanelsApproved, not yet built · 500 kW
Mar 2024
4.0 km away - Rooftop solar
Coldhams Business Park, Norman Way - Solar PanelsPlanning application in · 200 kW
Apr 2026
4.0 km away - Rooftop solar
St Bedes Inter-Church SchoolApproved, not yet built · 1 MW
Mar 2019
4.1 km away - Solar farm
Grain Stores, West Wratting - Solar ArrayApproved, not yet built
Sept 2025
4.6 km away - Solar farm
Low Fen, Drove Way - Solar FarmPlanning application in · 50 MW
Mar 2025
5.2 km away - Battery storage
Low Fen, Drove Way - Energy Storage SystemPlanning application in
Mar 2025
5.2 km away - Rooftop solar
Cambridge University Hospital, Hills Road - Solar PV PanelsApproved, not yet built
Jan 2026
5.5 km away - Solar farm
Newmarket Road, Bottisham - Solar ArrayApproved, not yet built · 50 MW
Dec 2023
5.8 km away - Battery storage
Newmarket Road, Bottisham - Battery Energy StorageApproved, not yet built · 50 MW
Dec 2023
5.8 km away - Rooftop solar
Levidian Nanosystems, Levidian Technology Centre - Solar PanelsPlanning application in · 180 kW
Dec 2022
6.2 km away
Road and street works within 1 km
11 permitted works running now or planned, 11 of them major.
- Major
School Lane, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
50 m away - Major, planned
Manor Walk, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Manor Walk, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major, planned
Home End, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major
Home End, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major, planned
High Street, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
300 m away - Major
High Street, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
300 m away - Major, planned
Greater Foxes, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Greater Foxes, FulbournHighway repair and maintenance works · CAMBRIDGESHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026450 m away
Major infrastructure projects within 30 km
- Decideddecided Apr 2025
5.7 km away - Pre-application
Kingsway Solar Farm Generating Stations · SE of Cambridge, 2.5km NW of Balsham and 3.8W of West Wratting. application due October 2026
6.1 km away - Decided
Sunnica Energy FarmGenerating Stations · Sunnica West is located south of Chippenham, and Sunnica East is located south of Worlington decided Jul 2024
18.3 km away - Decideddecided May 2016
20.0 km away - Pre-applicationapplication due August 2027
22.7 km away - Pre-applicationapplication due July 2027
26.9 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Great Wilbraham Solar Farm (solar farm, 3.4 km); Wadlow Wind Farm (wind farm, 6.7 km); Milton Landfill Site (landfill gas, 7.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.