Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Anglian Water
Teversham Stwinto Quy Water Bottisham Lode0 spills, 0 hours in 2025
35 new homes completed7 flats, 28 houses · Nov 2024 – Feb 2026
Feb 2026 1.8 km away
New homes
13 new homes completedhouses · Apr 2025 – Jan 2026
Jan 2026 2.0 km away
New homes
33 new homes completed27 flats, 6 houses · Mar 2025 – Dec 2025
Dec 2025 850 m away
New homes
32 new homes completedflats · Jun 2025 – Nov 2025
Nov 2025 1.8 km away
New homes
22 new homes completed15 flats, 7 houses · Dec 2024 – Oct 2025
Oct 2025 1.8 km away
New homes
23 new homes completed7 flats, 16 houses · Jan 2025 – Sep 2025
Sept 2025 950 m away
New homes
7 new homes completedhouses · Mar 2025 – Aug 2025
Aug 2025 1.6 km away
New homes
30 new homes completed1 flats, 29 houses · Nov 2024 – Jul 2025
Jul 2025 1.0 km away
New homes
23 new homes completedflats · Nov 2024 – Jun 2025
Jun 2025 1.8 km away
Planning permission
Permission for 11 homesHannah Reed And Associates Telford House 76 Cow Lane Fulbourn Cambridge Cambridgeshire CB21 5HB (other)
Sept 2022 1.9 km away
Planning permission
Permission for 48 homesColville Road Phase 3 Land At Colville Road And Fishers Lane High Street Cherry Hinton Cambridge Cambridgeshire CB1 9HT (full planning permission)
Jul 2022 1.9 km away
Planning permission
Permission for 203 homesIda Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE (reserved matters approval)
Apr 2022 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 28 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Kings College, West Road - Solar Photovoltaic panelsApproved, not yet built
Dec 2025 5.8 km away
Solar farm
Newmarket Road, Bottisham - Solar ArrayApproved, not yet built · 50 MW
Dec 2023 6.3 km away
Running nearest: Milton Landfill Site (landfill gas, 5.3 km); Great Wilbraham Solar Farm (solar farm, 5.4 km); Wadlow Wind Farm (wind farm, 9.1 km); Cantelupe Solar Farm (solar farm, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The project starts at A1/A421 Junction, Black Cat roundabout and finishes at A428/A1198 junction
decided Aug 2022 26.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.