Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
380hours of spills in 2025 between them (typical neighbourhood: about 36)
114spill events counted
United Utilities
Carleton Mill Pumping Stationinto River Petteril29 spills, 160 hours in 2025
1.9 km away
United Utilities
Scotby Csointo Collar Beck26 spills, 122 hours in 2025
1.4 km away
United Utilities
Petteril Railway Bridge Csointo River Petteril10 spills, 39 hours in 2025
1.6 km away
United Utilities
Melbourne Park Csointo River Petterill · near bathing water: Allonby 16 spills, 37 hours in 2025
1.5 km away
United Utilities
Gilford Park Cso (10542)into River Petteril13 spills, 12 hours in 2025
1.7 km away
United Utilities
Warick Roadwwnw Psinto River Petteril20 spills, 11 hours in 2025
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Botcherby & Harraby: +36% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.
Running nearest: Land between Orton Park Farm (solar farm, 6.2 km); Land at Wreay (solar farm, 6.9 km); Kingmoor Park (solar farm, 7.4 km); Orton Park Farm (wind farm, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.