What's changing near BS6 5LQ
Within 2 km, around St Werburghs in Bristol, City of. Building, planning, schools, transport, prices and crime.
121new homes completed within 2 km, last 2 years
1,927homes given permission on brownfield sites since 2021
+2.0%like-for-like prices in St Werburghs, 2024 → 2025 (council +2.7%)
+25%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
22 new homes completedflats · Sep 2026
Sept 2026
1.7 km away - New schoolJul 2026
1.7 km away - New homes
9 new homes completedflats · May 2026
May 2026
650 m away - New homes
5 new homes completedflats · Apr 2026
Apr 2026
750 m away - New homes
10 new homes completedflats · Feb 2026
Feb 2026
1.2 km away - New homes
7 new homes completedflats · Dec 2025
Dec 2025
1.5 km away - New homes
5 new homes completedflats · Dec 2025
Dec 2025
1.0 km away - New homes
9 new homes completedflats · Jul 2025 – Sep 2025
Sept 2025
750 m away - New homes
6 new homes completedflats · May 2025
May 2025
950 m away - School closed
School closed: St Barnabas Church of England VC Primary SchoolVoluntary controlled school, primary (closure)
Aug 2023
0 m away - Planning permissionAug 20231.9 km away
59homes extended 2021–2025, typically adding 27 m²
108since energy certificates began (2008)
2in BS6 5LQ itself
- Extendedcertificate 2011
- Extendedcertificate 2011
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
34storm overflows within 2 km
487hours of spills in 2025 between them (typical neighbourhood: about 36)
282spill events counted
- Wessex Water
Muller Road Csointo Horfield Brook (S)98 spills, 376 hours in 2025
1.6 km away - Wessex Water
Cranbrook Road Csointo Cranbrook Via Sws42 spills, 52 hours in 2025
1.3 km away - Wessex Water
Stapleton Rd And Glenfrome Rd Csointo River Frome27 spills, 9 hours in 2025
1.8 km away - Wessex Water
Greenbank View Csointo River Frome Via Sws9 spills, 7 hours in 2025
1.3 km away - Wessex Water
The Manse Csointo River Frome (S)2 spills, 6 hours in 2025
400 m away - Wessex Water
Devonshire Road Csointo Cranbrook Via Sws23 spills, 6 hours in 2025
1.3 km away - Wessex Water
Broadmead Csointo River Frome Via Sws2 spills, 5 hours in 2025
1.2 km away - Wessex Water
Muller Road Allotments Csointo Boiling Wells Lane Stream11 spills, 5 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
74 planned, approved or being built and 22 running (233 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Cotswold House, St Philips Road - olar PanelsApproved, not yet built · 190 kW
Jun 2024
1.4 km away - Battery storage
Drive Vauxhall, Avon Street - Battery Energy StorageApproved, not yet built · 600 kW
Mar 2023
1.9 km away - Battery storage
Philip Street Car BreakersApproved, not yet built · 7 MW
Jun 2020
2.3 km away - Rooftop solar
All Saints Church, Pembroke Road - Photovoltaic PanelsApproved, not yet built
May 2024
2.5 km away - Rooftop solar
Canons Way, City Centre - Solar Photovoltaics EquipmentApproved, not yet built · 170 kW
Jan 2026
2.6 km away - Rooftop solar
Avon Meads, Hollywood Bowl - Solar PV PanelsApproved, not yet built · 150 kW
Nov 2023
2.6 km away - Battery storage
Lockleaze Sports Centre, Bonnington Walk - Battery StorageApproved, not yet built · 200 kW
Oct 2023
3.2 km away - Battery storage
Bonnington Walk, Lockleaze - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Apr 2025
3.2 km away - Battery storage
Lockleaze Sports Centre, Bonnington Walk - Micro Energy StorageApproved, not yet built · 200 kW
Dec 2025
3.2 km away - Rooftop solar
University Of West Of England, Coldharbour Lane - Solar PanelsApproved, not yet built · 590 kW
Sept 20244.4 km away
Road and street works within 1 km
17 permitted works running now or planned, 1 of them major.
- Major
Cotham Brow, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Oct 2026 to Oct 2026
950 m away - Standard
Mina Road, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Nov 2026
450 m away - Standard
Seddon Road, BristolNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Standard
Clark Street, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Nov 2026
700 m away - Standard
Goodhind Street, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Nov 2026
750 m away - Standard
Perry Street, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Give and take
Nov 2026 to Nov 2026
750 m away - Standard
Ashley Down Road, BristolNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026
950 m away - Minor
Little Bishop Street, BristolHighway repair and maintenance works · BRISTOL CITY COUNCIL · Road closure
Oct 2026 to Oct 2026
600 m away - Minor
Chesterfield Road, BristolUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Give and take
Oct 2026 to Oct 2026600 m away
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
12.8 km away - Decideddecided Jan 2016
20.0 km away - Pre-applicationapplication due November 2026
20.6 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
22.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lockleaze Energy Storage (battery storage, 2.0 km); Feeder Road (battery storage, 2.5 km); Great Western Air Ambulance Charity - Solar Panels (rooftop solar, 4.5 km); Rolls Royce Filton Campus Building 184 (rooftop solar, 6.4 km); Rolls Royce Filton Campus Building 185 (rooftop solar, 6.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.