322new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Weston Town, 2024 → 2025 (council +1.3%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Aug 2025 – Oct 2026
Oct 2026
1.5 km away - New homes
26 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.6 km away - New homes
20 new homes completedhouses · May 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
17 new homes completedhouses · Oct 2024 – Jul 2026
Jul 2026
1.8 km away - New homes
28 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.6 km away - New homes
15 new homes completedhouses · Nov 2025 – Jun 2026
Jun 2026
2.0 km away - New homes
35 new homes completedhouses · Oct 2024 – Mar 2026
Mar 2026
1.9 km away - New homes
6 new homes completedflats · Mar 2026
Mar 2026
1.9 km away - New homes
7 new homes completedhouses · Dec 2025 – Feb 2026
Feb 2026
1.6 km away - New homes
19 new homes completed3 flats, 16 houses · Oct 2025 – Dec 2025
Dec 2025
1.5 km away - New homes
18 new homes completedhouses · Aug 2025 – Nov 2025
Nov 2025
1.5 km away - New homes
15 new homes completedhouses · Dec 2024 – Oct 2025
Oct 20251.9 km away
15homes extended 2021–2025, typically adding 23 m²
26since energy certificates began (2008)
2in BS23 3HG itself
- Extendedcertificate 2026
- Extendedcertificate 2022
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 6 running (48 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bournville Primary School, Selworthy Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
1.3 km away - Battery storage
Weston Youth Centre, Coleridge Road - Energy StorageApproved, not yet built · 200 kW
Feb 2026
1.9 km away - Rooftop solar
Weston College - Solar PanelsApproved, not yet built · 300 kW
Apr 2025
2.5 km away - Rooftop solar
Weston College University Campus, Loxton Road - Air Source Heat PumpsApproved, not yet built · 420 kW
Apr 2025
2.5 km away - Battery storage
Westbury Crescent, Loxton Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2026
2.5 km away - Rooftop solar
Weston General Hospital - Photovoltaic Installation ProjectPlanning application in
Aug 2021
2.8 km away - Battery storage
Bransby Way, Heron Moor School - Micro Energy Storage FacilityPlanning application in · 200 kW
Apr 2026
3.0 km away - Solar farm
Sandbay, Elmsley Lane, Kewstoke - Solar FarmApproved, not yet built · 25 MW
Oct 2024
3.2 km away - Rooftop solar
Morrisons, Worle Moor Gate - Solar Photovoltaic PanelsApproved, not yet built · 350 kW
Mar 2024
3.2 km away - Solar farm
Sewage Treatment Works, Warth Lane - Solar Photovoltaic PanelsApproved, not yet built
Road and street works within 1 km
12 permitted works running now or planned, 5 of them major.
- Major
Ashcombe Park Road, Weston-Super-MareRemedial works · WESSEX WATER · Road closure
Dec 2026 to Dec 2026
800 m away - Major, planned
Hildesheim Bridge, Weston-Super-MareHighway improvement works · NORTH SOMERSET COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Major
Hildesheim Bridge, Weston-Super-MareHighway improvement works · NORTH SOMERSET COUNCIL · Road closure
Oct 2026 to Oct 2026
850 m away - Major, planned
Baker Street, Weston-Super-MareUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Nov 2026 to Nov 2026
850 m away - Major
Baker Street, Weston-Super-MareUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Nov 2026 to Nov 2026
850 m away - Standard
Sandford Road, Weston-Super-MareUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Oct 2026
350 m away - Standard
Weston Links, Weston-Super-MareNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Baker Street, Weston-Super-MareNew service connection · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Standard
Baker Street, Weston-Super-MareNew service connection · National Grid Electricity Distribution (South West) · Some carriageway incursion
Major infrastructure projects within 30 km
- Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
8.3 km away - Decideddecided Jan 2016
12.9 km away - Decideddecided Mar 2013
19.4 km away - Decideddecided Nov 2022
20.5 km away - Pre-applicationapplication due November 2026
24.0 km away - Pre-applicationapplication due January 2027
26.5 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Grange (solar farm, 6.4 km); Bowerhouse Farm (solar farm, 6.7 km); Wick Farm Solar Park (solar farm, 6.7 km); Towerbrook Farm (Banwell Solar Farm) (solar farm, 7.4 km); Wick Lane Solar Ltd (solar farm, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.