What's changing near BS23 3HB
Within 2 km, around Weston Town in North Somerset. Building, planning, schools, transport, prices and crime.
140new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.9%like-for-like prices in Weston Town, 2024 → 2025 (council +1.3%)
-4%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedhouses · Aug 2025 – Oct 2026
Oct 2026
1.8 km away - New homes
26 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
28 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
6 new homes completedflats · Mar 2026
Mar 2026
1.6 km away - New homes
7 new homes completedhouses · Dec 2025 – Feb 2026
Feb 2026
1.9 km away - New homes
19 new homes completed3 flats, 16 houses · Oct 2025 – Dec 2025
Dec 2025
1.8 km away - New homes
18 new homes completedhouses · Aug 2025 – Nov 2025
Nov 2025
1.8 km away - New homes
9 new homes completedflats · Aug 2025
Aug 2025
1.3 km away - School closed
School closed: Ashbrooke House SchoolOther independent school, other independent school (closure)
Jul 2022
1.2 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 20 postcodes nearby had new homes completed in the last two years.
23homes extended 2021–2025, typically adding 28 m²
47since energy certificates began (2008)
1in BS23 3HB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
- Wessex Water
Not Applicableinto Weston Bay (E) · near bathing water: Weston-super-Mare Uphill Slipway; Weston Main1 spills, 0 hours in 2025
1.7 km away - Wessex Water
Knightstone Overflowinto Weston Bay (E) · near bathing water: Weston-super-Mare Uphill Slipway; Weston Main0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 6 running (48 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bournville Primary School, Selworthy Road - Solar PanelsApproved, not yet built · 320 kW
Dec 2025
1.4 km away - Battery storage
Weston Youth Centre, Coleridge Road - Energy StorageApproved, not yet built · 200 kW
Feb 2026
2.0 km away - Rooftop solar
Weston College - Solar PanelsApproved, not yet built · 300 kW
Apr 2025
2.6 km away - Rooftop solar
Weston College University Campus, Loxton Road - Air Source Heat PumpsApproved, not yet built · 420 kW
Apr 2025
2.6 km away - Battery storage
Westbury Crescent, Loxton Road - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Feb 2026
2.6 km away - Rooftop solar
Weston General Hospital - Photovoltaic Installation ProjectPlanning application in
Aug 2021
2.8 km away - Solar farm
Sandbay, Elmsley Lane, Kewstoke - Solar FarmApproved, not yet built · 25 MW
Oct 2024
3.2 km away - Battery storage
Bransby Way, Heron Moor School - Micro Energy Storage FacilityPlanning application in · 200 kW
Apr 2026
3.2 km away - Rooftop solar
Morrisons, Worle Moor Gate - Solar Photovoltaic PanelsApproved, not yet built · 350 kW
Mar 2024
3.5 km away - Solar farm
Sewage Treatment Works, Warth Lane - Solar Photovoltaic PanelsApproved, not yet built
Road and street works within 1 km
19 permitted works running now or planned, 7 of them major.
- Major, planned
Baker Street, Weston-Super-MareUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Nov 2026 to Nov 2026
550 m away - Major
Baker Street, Weston-Super-MareUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Nov 2026 to Nov 2026
550 m away - Major, planned
Hildesheim Bridge, Weston-Super-MareHighway improvement works · NORTH SOMERSET COUNCIL · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Hildesheim Bridge, Weston-Super-MareHighway improvement works · NORTH SOMERSET COUNCIL · Road closure
Oct 2026 to Oct 2026
600 m away - Major
Ashcombe Park Road, Weston-Super-MareRemedial works · WESSEX WATER · Road closure
Dec 2026 to Dec 2026
750 m away - Major
Montpelier, Weston-Super-MareHighway repair and maintenance works · NORTH SOMERSET COUNCIL · Road closure
Dec 2026 to Jan 2027
800 m away - Major
Montpelier, Weston-Super-MareHighway repair and maintenance works · NORTH SOMERSET COUNCIL · Road closure
Nov 2026 to Dec 2026
900 m away - Standard
Sandford Road, Weston-Super-MareUtility asset works · Grain Communications Limited (formerly Solway Communications Limited) · Give and take
Oct 2026 to Oct 2026
100 m away - Standard
Baker Street, Weston-Super-MareNew service connection · WALES AND WEST UTILITIES LTD · Some carriageway incursion
Oct 2026 to Oct 2026550 m away
Major infrastructure projects within 30 km
- Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
8.6 km away - Decideddecided Jan 2016
13.2 km away - Decideddecided Mar 2013
19.3 km away - Decideddecided Nov 2022
20.6 km away - Pre-applicationapplication due November 2026
24.0 km away - Pre-applicationapplication due January 2027
26.5 km away
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Grange (solar farm, 6.6 km); Wick Farm Solar Park (solar farm, 6.8 km); Bowerhouse Farm (solar farm, 7.0 km); Towerbrook Farm (Banwell Solar Farm) (solar farm, 7.7 km); Wick Lane Solar Ltd (solar farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.