What's changing near BS16 7GA
Within 2 km, around Emersons Green in South Gloucestershire. Building, planning, schools, transport, prices and crime.
48new homes completed within 2 km, last 2 years
14homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Emersons Green, 2024 → 2025 (council +2.6%)
+12%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completed6 flats, 3 houses · Nov 2025 – Mar 2026
Mar 2026
1.6 km away - New homes
5 new homes completedhouses · Dec 2024 – Jan 2025
Jan 2025
1.9 km away - Planning permissionDec 2023
1.9 km away - Planning permission
Permission for 5 homesBuildings At Henfield Farm The Hollows Coalpit Heath South Gloucestershire BS36 2UU (full planning permission) Mar 2022
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 28 m²
20since energy certificates began (2008)
0in BS16 7GA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
- Wessex Water
Not Applicableinto Unnamed Tributary Of The River Frome0 spills, 0 hours in 2025
750 m away - Wessex Water
14 Downleaze Road Csointo Trib Of River Frome Via Sws0 spills, 0 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
57 planned, approved or being built and 15 running (240 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Leisure Club, Willowherb Road - Solar PanelsApproved, not yet built · 260 kW
Sept 2023
100 m away - Hydrogen
Iaaps, Newlands Lane - Solar Panels & Hydrogen StorageApproved, not yet built
Oct 2022
450 m away - Rooftop solar
Iaaps, Newlands Lane - Solar Panels & Hydrogen StorageApproved, not yet built · 690 kW
Oct 2022
450 m away - Rooftop solar
Sainsburys Supermarkets Limited, The Village - Solar PanelsApproved, not yet built · 500 kW
Mar 2024
500 m away - Rooftop solar
Emerald Park, Emersons Green - Solar PanelsApproved, not yet built · 210 kW
May 2023
1000 m away - Rooftop solar
Folly Brook Road, Emersons Green - Solar PanelsApproved, not yet built · 1 MW
Oct 2022
1.3 km away - Rooftop solar
DPD Bristol, Emersons Green - Solar PanelsApproved, not yet built · 470 kW
Mar 2024
1.3 km away - Solar farm
Westerleigh Solar, Oakleigh Green Farm Lane - Solar PanelsApproved, not yet built · 1 MW
Jun 2025
2.8 km away - Battery storage
Westerleigh Hill, Westerleigh - Battery Energy Storage FacilityApproved, not yet built · 200 MW
Jul 2024
2.9 km away - Battery storage
Stoke Gifford Bypass, Curtis Lane - Micro Energy Storage SystemApproved, not yet built · 200 kW
Mar 20263.7 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
19.5 km away - Examinationapplication due September 2025
23.6 km away - Pre-applicationapplication due November 2026
26.0 km away - Decideddecided Jan 2016
27.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Amcor Flexibles (rooftop solar, 4.4 km); Says Court Farm solar park (solar farm, 4.9 km); Hare Brewery - Solar Panels (rooftop solar, 5.1 km); Grange Farm (Avon) (solar farm, 5.8 km); Ring O Bells Farm (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.