What's changing near BS14 0NR
Within 2 km, around Whitchurch Park in Bristol, City of. Building, planning, schools, transport, prices and crime.
161new homes completed within 2 km, last 2 years
643homes given permission on brownfield sites since 2021
+7.7%like-for-like prices in Whitchurch Park, 2024 → 2025 (council +2.7%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedhouses · Sep 2026
Sept 2026
1.1 km away - New homes
70 new homes completed31 flats, 39 houses · Jun 2025 – Apr 2026
Apr 2026
1.9 km away - New homes
7 new homes completedhouses · Mar 2026
Apr 2026
1.7 km away - New homes
27 new homes completedflats · Jan 2026
Feb 2026
1.0 km away - New homes
26 new homes completedflats · Jan 2026
Feb 2026
1.0 km away - New homes
19 new homes completed16 flats, 3 houses · Dec 2024 – Oct 2025
Oct 2025
1.3 km away - Planning permissionMay 2023
1.8 km away - Planning permissionJun 2022
1.1 km away - Planning permission
Permission for 70 homesLand Between Hengrove Way And Wills Way Imperial Park Wills Way Bristol BS13 7TJ (full planning permission) Apr 2022
1.9 km away - Planning permission
20homes extended 2021–2025, typically adding 27 m²
34since energy certificates began (2008)
1in BS14 0NR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 6 running (43 MW between them). Those within 5 km are on the map above.
- Solar farm
Hill Farm, East Dundry Road - Solar FarmPlanning application in
Sept 2025
600 m away - Rooftop solar
Bottle Yard Studios (TBY2) - Solar panelsApproved, not yet built · 990 kW
Jun 2022
1.3 km away - Rooftop solar
Western Drive, Hengrove - Solar panelsApproved, not yet built · 240 kW
Jul 2024
1.6 km away - Rooftop solar
Robinson House Nursing Home, Sturminster Road - Solar PhotovoltaicsApproved, not yet built
Nov 2024
1.6 km away - Rooftop solar
Peterson Avenue, Hartcliffe - Solar Photovoltaics PV equipmentApproved, not yet built · 470 kW
Mar 2022
1.7 km away - Solar farm
East Dundry Lane, Norton Hawkfield - Solar PanelsPlanning application in · 15 MW
Jul 2025
2.7 km away - Solar farm
East Dundry Lane, Norton Hawkfield - Solar FarmPlanning application in · 15 MW
Jul 2025
2.7 km away - Rooftop solar
Queens Road, Bishopsworth - Solar PanelsApproved, not yet built
Nov 2024
3.0 km away - Solar farm
East Dundry Lane, Norton Hawsfield - Solar FarmPlanning application in
Jul 2025
3.1 km away - Anaerobic digestion
Queen Charlton Quarry Renewable Energy Facility - food wasteBeing built · 2 MW
May 2016
3.7 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
15.7 km away - Decideddecided Jan 2016
15.9 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
19.6 km away - Pre-applicationapplication due November 2026
24.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Feeder Road (battery storage, 4.8 km); Great Western Air Ambulance Charity - Solar Panels (rooftop solar, 5.3 km); Chelwood Solar Farm (solar farm, 7.5 km); Hunstrete (Wilmington Farm) (solar farm, 7.7 km); Lockleaze Energy Storage (battery storage, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.