What's changing near BS13 7PD
Within 2 km, around Headley Park in Bristol, City of. Building, planning, schools, transport, prices and crime.
225new homes completed within 2 km, last 2 years
529homes given permission on brownfield sites since 2021
+6.6%like-for-like prices in Headley Park, 2024 → 2025 (council +2.7%)
+41%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
70 new homes completed31 flats, 39 houses · Jun 2025 – Apr 2026
Apr 2026
850 m away - New homes
27 new homes completedflats · Jan 2026
Feb 2026
1.8 km away - New homes
26 new homes completedflats · Jan 2026
Feb 2026
1.8 km away - New homes
6 new homes completedhouses · Jan 2026
Jan 2026
100 m away - New homes
8 new homes completedflats · Sep 2025 – Nov 2025
Nov 2025
1.6 km away - New homes
30 new homes completed19 flats, 11 houses · Oct 2024 – Oct 2025
Oct 2025
1.4 km away - New homes
19 new homes completed5 flats, 14 houses · Jul 2025 – Sep 2025
Sept 2025
1.5 km away - New schoolAug 2025
1.0 km away - New homes
12 new homes completedflats · May 2025
Jun 2025
1.0 km away - New homes
6 new homes completedflats · Dec 2024
Dec 2024
1.8 km away - Planning permission
19homes extended 2021–2025, typically adding 32 m²
32since energy certificates began (2008)
0in BS13 7PD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
118hours of spills in 2025 between them (typical neighbourhood: about 36)
49spill events counted
- Wessex Water
Headley Road/Avon Roadinto Malago (S)20 spills, 52 hours in 2025
350 m away - Wessex Water
Manor Wood Csointo The Malago16 spills, 34 hours in 2025
550 m away - Wessex Water
Queens Head Combined Sewer Overflowinto Trib Of The Malago5 spills, 23 hours in 2025
1000 m away - Wessex Water
Derham Road Csointo Trib Of The Malago1 spills, 5 hours in 2025
600 m away - Wessex Water
Fortfield Rd Csointo Pigeonhouse Stream Via Sws5 spills, 4 hours in 2025
550 m away - Wessex Water
Tugela Road Csointo The Malago (Via Sws)2 spills, 0 hours in 2025
500 m away - Wessex Water
Vale Lane Combined Sewer Overflowinto The Malago0 spills, 0 hours in 2025
1.0 km away - Wessex Water
Old Mead Walk Csointo Trib . Colliters Brook Via Sws0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 3 running (35 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Queens Road, Bishopsworth - Solar PanelsApproved, not yet built
Nov 2024
850 m away - Rooftop solar
Bottle Yard Studios (TBY2) - Solar panelsApproved, not yet built · 990 kW
Jun 2022
1.4 km away - Rooftop solar
Peterson Avenue, Hartcliffe - Solar Photovoltaics PV equipmentApproved, not yet built · 470 kW
Mar 2022
1.5 km away - Rooftop solar
Western Drive, Hengrove - Solar panelsApproved, not yet built · 240 kW
Jul 2024
1.7 km away - Solar farm
Hersey Gardens - Solar PanelsPlanning application in · 2 MW
Jan 2026
2.1 km away - Solar farm
Hill Farm, East Dundry Road - Solar FarmPlanning application in
Sept 2025
2.3 km away - Solar farm
East Dundry Lane, Norton Hawsfield - Solar FarmPlanning application in
Jul 2025
2.6 km away - Solar farm
East Dundry Lane, Norton Hawkfield - Solar FarmPlanning application in · 15 MW
Jul 2025
2.7 km away - Rooftop solar
David Lloyd Leisure Plc, Ashton Road - Solar PV panelsApproved, not yet built · 700 kW
Sept 2023
2.7 km away - Solar farm
Epic Long Ashton, Phase 1 - 3 Office BuildingsBeing built · 1 MW
Oct 2025
3.2 km away - Rooftop solar
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
13.0 km away - Decideddecided Jan 2016
14.7 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
18.1 km away - Pre-applicationapplication due November 2026
22.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Great Western Air Ambulance Charity - Solar Panels (rooftop solar, 2.9 km); Feeder Road (battery storage, 4.6 km); Lockleaze Energy Storage (battery storage, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.