What's changing near BS10 6LS
Within 2 km, around Southmead in Bristol, City of. Building, planning, schools, transport, prices and crime.
467new homes completed within 2 km, last 2 years
1,385homes given permission on brownfield sites since 2021
+1.2%like-for-like prices in Southmead, 2024 → 2025 (council +2.7%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
24 new homes completedhouses · May 2026 – Oct 2026
planned Oct 2026
1.4 km away - New homes
22 new homes completedhouses · Jul 2025 – Oct 2026
planned Oct 2026
450 m away - New homes
22 new homes completedhouses · Nov 2025 – Oct 2026
Oct 2026
1.3 km away - New homes
37 new homes completedhouses · Mar 2025 – Sep 2026
Sept 2026
1.5 km away - New homes
6 new homes completedhouses · Aug 2026
Aug 2026
1.4 km away - New homes
23 new homes completedhouses · Aug 2025 – Aug 2026
Aug 2026
1.3 km away - New homes
15 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
1.4 km away - New homes
16 new homes completedhouses · Apr 2025 – May 2026
May 2026
1.3 km away - New homes
12 new homes completedhouses · Jul 2025 – May 2026
May 2026
1.6 km away - New homes
24 new homes completed9 flats, 15 houses · Nov 2024 – Apr 2026
Apr 2026
450 m away - New homes
8 new homes completedhouses · Feb 2026 – Apr 2026
Apr 2026
1.9 km away - New homes
13 new homes completedhouses · Dec 2025 – Apr 2026
Apr 20261.3 km away
7homes extended 2021–2025, typically adding 22 m²
16since energy certificates began (2008)
2in BS10 6LS itself
- Extendedcertificate 2026
- Extendedcertificate 2014
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
10hours of spills in 2025 between them (typical neighbourhood: about 36)
13spill events counted
- Wessex Water
Cleve Court 2 Csointo Stoke Brook (S)7 spills, 8 hours in 2025
2.0 km away - Wessex Water
Cleeve Roadinto Stoke Brook (S)6 spills, 2 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
70 planned, approved or being built and 28 running (265 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Lanercost Resource And Activity Centre - Solar Photovoltaics PanelsPlanning application in
Dec 2025
650 m away - Rooftop solar
Pieminister Kitchens, Charlton Road - Solar PanelsPlanning application in · 160 kW
Mar 2025
1000 m away - Rooftop solar
Airbus UK Industrial Complex - Solar panelsApproved, not yet built · 3 MW
Apr 2024
1.2 km away - Rooftop solar
Cribbs Causeway, Merlin Road - Solar PanelsApproved, not yet built · 440 kW
Oct 2022
1.3 km away - Rooftop solar
Morrison Supermarket, Lysander Road - Solar PanelsApproved, not yet built
Dec 2022
1.7 km away - Rooftop solar
Dunelm, Centaurus Road - Solar PanelsApproved, not yet built · 180 kW
May 2023
1.8 km away - Rooftop solar
Carshop Bristol, Bolingbroke Way - Solar PanelsApproved, not yet built · 150 kW
May 2023
2.0 km away - Rooftop solar
Abbey Wood Retail Park, Filton - Solar PanelsApproved, not yet built · 880 kW
Oct 2023
2.5 km away - Rooftop solar
Abbey Wood Retail Park, Station Road - Solar PanelsApproved, not yet built · 320 kW
Oct 2023
2.5 km away - Battery storage
Lockleaze Sports Centre, Bonnington Walk - Battery StorageApproved, not yet built · 200 kW
Oct 2023
2.7 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
12.0 km away - Pre-applicationapplication due November 2026
17.9 km away - Decideddecided Jan 2016
23.4 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
25.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Rolls Royce Filton Campus Building 184 (rooftop solar, 2.1 km); Rolls Royce Filton Campus Building 185 (rooftop solar, 2.1 km); Lockleaze Energy Storage (battery storage, 3.5 km); Oakham Farm (solar farm, 3.8 km); Moorhouse Lane (solar farm, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.