What's changing near BS10 5FH
Within 2 km, around Monks Park in Bristol, City of. Building, planning, schools, transport, prices and crime.
230new homes completed within 2 km, last 2 years
199homes given permission on brownfield sites since 2021
+3.3%like-for-like prices in Monks Park, 2024 → 2025 (council +2.7%)
+18%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Sep 2026
Sept 2026
400 m away - New homes
5 new homes completedflats · Sep 2026
Sept 2026
1.8 km away - New homes
5 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
23 new homes completedhouses · Feb 2026 – Aug 2026
Aug 2026
1.4 km away - New homes
19 new homes completed1 flats, 18 houses · Jul 2025 – Mar 2026
Mar 2026
1.8 km away - New homes
10 new homes completedflats · Feb 2026
Feb 2026
1.8 km away - New homes
60 new homes completedhouses · Feb 2025 – Jan 2026
Jan 2026
1.8 km away - New homes
34 new homes completedhouses · Sep 2025 – Dec 2025
Dec 2025
1.9 km away - New homes
10 new homes completedhouses · Oct 2025
Oct 2025
1.7 km away - New homes
9 new homes completedhouses · Jul 2025
Jul 2025
300 m away - Planning permissionMay 2023
1.4 km away - Planning permission
30homes extended 2021–2025, typically adding 40 m²
41since energy certificates began (2008)
0in BS10 5FH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
37storm overflows within 2 km
1,672hours of spills in 2025 between them (typical neighbourhood: about 36)
805spill events counted
- Wessex Water
Muller Road Csointo Horfield Brook (S)98 spills, 376 hours in 2025
1.4 km away - Wessex Water
Wordsworth Road Attenuation Tankcsointo Horfield Brook59 spills, 231 hours in 2025
1.5 km away - Wessex Water
Filton Avenue Csointo Horfield Brook Via Sws80 spills, 194 hours in 2025
1.5 km away - Wessex Water
Wellington Hill West Csointo Trib Of River Trym Via Sws45 spills, 152 hours in 2025
850 m away - Wessex Water
Westbury On Trym Storm Overflowinto River Avon (S)36 spills, 109 hours in 2025
1.8 km away - Wessex Water
Glenwood Road Csointo Tributary Of The River Trym39 spills, 94 hours in 2025
850 m away - Wessex Water
Bishopthorpe Road Csointo Trib Of River Trym Via Sws52 spills, 75 hours in 2025
850 m away - Wessex Water
Cherington Road Csointo Trib Of River Trym Via Sws29 spills, 73 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
75 planned, approved or being built and 26 running (256 MW between them). Those within 5 km are on the map above.
- Battery storage
Lockleaze Sports Centre, Bonnington Walk - Battery StorageApproved, not yet built · 200 kW
Oct 2023
1.8 km away - Battery storage
Bonnington Walk, Lockleaze - Micro Energy Storage FacilityApproved, not yet built · 200 kW
Apr 2025
1.8 km away - Battery storage
Lockleaze Sports Centre, Bonnington Walk - Micro Energy StorageApproved, not yet built · 200 kW
Dec 2025
1.8 km away - Rooftop solar
Lanercost Resource And Activity Centre - Solar Photovoltaics PanelsPlanning application in
Dec 2025
2.0 km away - Rooftop solar
Pieminister Kitchens, Charlton Road - Solar PanelsPlanning application in · 160 kW
Mar 2025
2.2 km away - Rooftop solar
Airbus UK Industrial Complex - Solar panelsApproved, not yet built · 3 MW
Apr 2024
2.7 km away - Rooftop solar
Abbey Wood Retail Park, Station Road - Solar PanelsApproved, not yet built · 320 kW
Oct 2023
2.8 km away - Rooftop solar
Abbey Wood Retail Park, Filton - Solar PanelsApproved, not yet built · 880 kW
Oct 2023
2.8 km away - Rooftop solar
University Of West Of England, Coldharbour Lane - Solar PanelsApproved, not yet built · 590 kW
Sept 2024
3.3 km away - Rooftop solar
All Saints Church, Pembroke Road - Photovoltaic PanelsApproved, not yet built
Road and street works within 1 km
3 permitted works running now or planned, 1 of them major.
- Major
Highbury Road, BristolUtility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Oct 2026 to Oct 2026
600 m away - Minor
Gloucester Road, BristolUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Some carriageway incursion
Oct 2026 to Oct 2026
800 m away - Minor
Lake Road, BristolUtility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Nov 2022
11.8 km away - Pre-applicationapplication due November 2026
18.8 km away - Decideddecided Jan 2016
21.5 km away - Pre-application
Hinkley Point C Connection Project Material ChangeElectric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028
23.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lockleaze Energy Storage (battery storage, 1.6 km); Rolls Royce Filton Campus Building 184 (rooftop solar, 4.0 km); Rolls Royce Filton Campus Building 185 (rooftop solar, 4.0 km); Feeder Road (battery storage, 5.2 km); Moorhouse Lane (solar farm, 5.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.