Country England and Wales › Region South West › Council Bristol, City of › Neighbourhood Monks Park › Postcode BS10 5BB What's changing near BS10 5BB Within 2 km, around Monks Park in Bristol, City of. Building, planning, schools, transport, prices and crime.
226 new homes completed within 2 km, last 2 years
246 homes given permission on brownfield sites since 2021
+3.3% like-for-like prices in Monks Park, 2024 → 2025 (council +2.7%)
+18% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed flats · Sep 2026
Sept 2026 200 m away New homes 5 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1.8 km away New homes 23 new homes completed houses · Feb 2026 – Aug 2026
Aug 2026 1.4 km away New homes 19 new homes completed 1 flats, 18 houses · Jul 2025 – Mar 2026
Mar 2026 1.6 km away New homes 10 new homes completed flats · Feb 2026
Feb 2026 1.9 km away New homes 60 new homes completed houses · Feb 2025 – Jan 2026
Jan 2026 1.6 km away New homes 34 new homes completed houses · Sep 2025 – Dec 2025
Dec 2025 1.8 km away New homes 10 new homes completed houses · Oct 2025
Oct 2025 1.6 km away New homes 9 new homes completed houses · Jul 2025
Jul 2025 100 m away Planning permission May 2023 1.5 km away Planning permission 23 homes extended 2021–2025, typically adding 36 m²
33 since energy certificates began (2008)
1 in BS10 5BB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 29 storm overflows within 2 km
1,601 hours of spills in 2025 between them (typical neighbourhood: about 36)
693 spill events counted
Wessex Water Muller Road Cso into Horfield Brook (S) 98 spills, 376 hours in 2025
1.6 km away Wessex Water Wordsworth Road Attenuation Tankcso into Horfield Brook 59 spills, 231 hours in 2025
1.5 km away Wessex Water Filton Avenue Cso into Horfield Brook Via Sws 80 spills, 194 hours in 2025
1.5 km away Wessex Water Wellington Hill West Cso into Trib Of River Trym Via Sws 45 spills, 152 hours in 2025
900 m away Wessex Water Westbury On Trym Storm Overflow into River Avon (S) 36 spills, 109 hours in 2025
1.8 km away Wessex Water Glenwood Road Cso into Tributary Of The River Trym 39 spills, 94 hours in 2025
900 m away Wessex Water Bishopthorpe Road Cso into Trib Of River Trym Via Sws 52 spills, 75 hours in 2025
900 m away Wessex Water Cherington Road Cso into Trib Of River Trym Via Sws 29 spills, 73 hours in 2025
900 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 74 planned, approved or being built and 26 running (256 MW between them). Those within 5 km are on the map above.
Battery storage Lockleaze Sports Centre, Bonnington Walk - Battery Storage Approved, not yet built · 200 kW
Oct 2023 1.7 km away Battery storage Bonnington Walk, Lockleaze - Micro Energy Storage Facility Approved, not yet built · 200 kW
Apr 2025 1.7 km away Battery storage Lockleaze Sports Centre, Bonnington Walk - Micro Energy Storage Approved, not yet built · 200 kW
Dec 2025 1.7 km away Rooftop solar Lanercost Resource And Activity Centre - Solar Photovoltaics Panels Planning application in
Dec 2025 1.8 km away Rooftop solar Pieminister Kitchens, Charlton Road - Solar Panels Planning application in · 160 kW
Mar 2025 2.0 km away Rooftop solar Airbus UK Industrial Complex - Solar panels Approved, not yet built · 3 MW
Apr 2024 2.5 km away Rooftop solar Abbey Wood Retail Park, Station Road - Solar Panels Approved, not yet built · 320 kW
Oct 2023 2.6 km away Rooftop solar Abbey Wood Retail Park, Filton - Solar Panels Approved, not yet built · 880 kW
Oct 2023 2.6 km away Rooftop solar University Of West Of England, Coldharbour Lane - Solar Panels Approved, not yet built · 590 kW
Sept 2024 3.2 km away Rooftop solar Carshop Bristol, Bolingbroke Way - Solar Panels Approved, not yet built · 150 kW
Road and street works within 1 km 3 permitted works running now or planned, 1 of them major.
Major Highbury Road, Bristol Utility repair and maintenance works · WALES AND WEST UTILITIES LTD · Road closure
Oct 2026 to Oct 2026 500 m away Minor Lake Road, Bristol Utility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Road closure
Oct 2026 to Oct 2026 950 m away Minor Gloucester Road, Bristol Utility repair and maintenance works · BRISTOL WATERWORKS COMPANY · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2022 11.9 km away Pre-application application due November 2026 18.8 km away Decided decided Jan 2016 21.7 km away Pre-application Hinkley Point C Connection Project Material Change Electric Lines · The Project proposes permanent access infrastructure for the purpose of maintenance access and operation at locations between Bridgwater and Seabank, in the administrative boundaries of Bristol City, North Somerset, Somerset and South Gloucestershire Councils. application due January 2028 24.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Lockleaze Energy Storage (battery storage, 1.6 km); Rolls Royce Filton Campus Building 184 (rooftop solar, 3.8 km); Rolls Royce Filton Campus Building 185 (rooftop solar, 3.8 km); Moorhouse Lane (solar farm, 5.2 km); Feeder Road (battery storage, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.