Country England and Wales › Region South East › Council Sevenoaks › Neighbourhood Swanley South & Crockenhill › Postcode BR8 8AU What's changing near BR8 8AU Within 2 km, around Swanley South & Crockenhill in Sevenoaks. Building, planning, schools, transport, prices and crime.
78 new homes completed within 2 km, last 2 years
99 homes given permission on brownfield sites since 2021
+2.0% like-for-like prices in Swanley South & Crockenhill, 2024 → 2025 (council +1.5%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed houses · Nov 2024 – Mar 2026
Mar 2026 1.2 km away New homes 9 new homes completed houses · Dec 2024 – Nov 2025
Nov 2025 800 m away New homes 8 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 850 m away New homes 24 new homes completed flats · Jul 2025 – Nov 2025
Nov 2025 750 m away New homes 9 new homes completed houses · May 2025 – Jul 2025
Jul 2025 850 m away New homes 8 new homes completed houses · Nov 2024 – Feb 2025
Feb 2025 850 m away Planning permission May 2021 700 m away Planning permission Feb 2021 300 m away Planning permission Jan 2021 650 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 20 m²
20 since energy certificates began (2008)
1 in BR8 8AU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 3 running (81 MW between them). Those within 5 km are on the map above.
Rooftop solar White Oak Leisure Centre, Hilda May Avenue - Solar Panels Approved, not yet built · 430 kW
Dec 2024 1.0 km away Solar farm Horton Wood - Solar park Approved, not yet built · 50 MW
Feb 2023 3.5 km away Rooftop solar Tesco Stores Limited, Edgington Way - Solar Panels Approved, not yet built · 180 kW
Nov 2025 4.6 km away Rooftop solar Maidstone Road - Solar Panels Approved, not yet built · 340 kW
Dec 2023 5.0 km away Rooftop solar David Lloyd Leisure, Baugh Road - Solar Panels Approved, not yet built
Sept 2025 5.3 km away Battery storage Manor Farm, Dartford Road - Energy Storage System Planning application in · 212 MW
Jun 2025 5.3 km away Battery storage Darenth Road - Battery Energy Storage System Approved, not yet built · 100 MW
Oct 2025 5.3 km away Rooftop solar Fairfield Pool, Lowfield Street - Solar Panels Approved, not yet built · 410 kW
Oct 2023 5.3 km away Rooftop solar Fairfield Centre, Lowfield Street - Solar Panels Approved, not yet built · 160 kW
Oct 2023 5.3 km away Biomass St Margaret's Farm - Green Waste Composting Facility Being built
Mar 2020 5.5 km away Rooftop solar Road and street works within 1 km 23 permitted works running now or planned, 4 of them major.
Major London Road, Swanley Highway improvement works · KENT COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 550 m away Major London Road, Swanley Highway improvement works · KENT COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026 600 m away Major London Road, Swanley Highway improvement works · KENT COUNTY COUNCIL · No carriageway incursion
Jun 2026 to May 2027 650 m away Major London Road, Swanley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Aug 2026 to Oct 2026 650 m away Standard High Street, Swanley Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
May 2027 to May 2027 400 m away Standard High Street, Swanley Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Nov 2026 to Nov 2026 400 m away Standard Bartholomew Way, Swanley Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
May 2027 to May 2027 600 m away Standard Bartholomew Way, Swanley Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Nov 2026 to Nov 2026 650 m away Standard London Road, Swanley Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
May 2027 to May 2027 750 m away Standard
Major infrastructure projects within 30 km Decided decided Nov 2025 12.2 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 12.4 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 15.6 km away Pre-application application due March 2028 15.9 km away Decided decided Feb 2022 16.4 km away Decided decided Mar 2025 16.7 km away Decided Transport schemes within 20 km David Lloyd Sports Centre, Darenth Road - Solar Photo Voltaic System Approved, not yet built · 300 kW
Running nearest: Littlebrook Battery Storage (battery storage, 8.4 km); Longreach STW - extension (other, 8.5 km); Riverside Resource Recovery Facility (RRRF) (energy from waste, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.