What's changing near BR7 6LY
Within 2 km, around Chislehurst North in Bromley. Building, planning, schools, transport, prices and crime.
47new homes completed within 2 km, last 2 years
30homes given permission on brownfield sites since 2021
-0.9%like-for-like prices in Chislehurst North, 2024 → 2025 (council +1.6%)
+20%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
7 new homes completedflats · Jul 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
5 new homes completedflats · Apr 2025
Apr 2025
2.0 km away - New homes
18 new homes completedflats · Dec 2024
Dec 2024
1.9 km away - Planning permissionSept 2024
2.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 15 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
3net new homes in approved schemes since 2023
- Application Under Consideration
Telson Lodge, Kemnal Road, BR7 6LYBROOKS JN16913Bromley 25/02088/TPO · All Other
Jun 2025
400 m away - Application Under Consideration
Telson Lodge, Kemnal Road, BR7 6LYYew x 4 - Crown reduce the height and spread by up 2m.Bromley 25/02088/TREE · All Other
Jun 2025
400 m away - Application Under Consideration
Kemnal Warren, Kemnal Road, BR7 6NAT1 Ash tree - Dismantle in sections and grind stump.Bromley 25/01914/TREE · All Other
May 2025
100 m away - No Objection to Proposal (OBS only)
Little Byfield, Kemnal Road, BR7 6LYT1 Conifer & Holly - Trim lateral growth back to boundary. T2 Lawson Cypress - Section fell. T4 Leyland Cypress - Reduce height of lowest tree in centre by 1m. Reduce remaining trees to match this height (2-5m). T5 Oak (Yew & Hazel) - Remove lowest branch of the Oak. Trim the adjacent Yew and Hazel in line with the adjacent hedge.Bromley 25/01902/TREE · All Other
May 2025
100 m away - Application Under Consideration
Arran, Heathley End, BR7 6ABConstruction of garden room with gym sauna and outdoor kitchen/bbq area LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01854/PLUD · All Other
May 2025
400 m away - No Objection to Proposal (OBS only)
8, Acorn Close, BR7 6LDT1/2 Ash trees - Fell to ground level.Bromley 25/01864/TREE · All Other
May 2025
200 m away - Refused
2, Queenborough Gardens, BR7 6NPIan Hunt - 2 , Queensborough Gardens, Chistlehurst
16homes extended 2021–2025, typically adding 31 m²
27since energy certificates began (2008)
2in BR7 6LY itself
- Extendedcertificate 2024
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
62hours of spills in 2025 between them (typical neighbourhood: about 36)
33spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
32 planned, approved or being built and 3 running (74 MW between them). Those within 5 km are on the map above.
- Rooftop solar
David Lloyd Leisure, Baugh Road - Solar PanelsApproved, not yet built
Sept 2025
2.8 km away - Rooftop solar
Avery Hill Campus, Avery Hill Road - Solar PanelsApproved, not yet built · 530 kW
Mar 2026
3.0 km away - Rooftop solar
Maidstone Road - Solar PanelsApproved, not yet built · 340 kW
Dec 2023
3.1 km away - Rooftop solar
Tesco Stores Limited, Edgington Way - Solar PanelsApproved, not yet built · 180 kW
Nov 2025
3.2 km away - Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
4.5 km away - Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
4.6 km away - Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
4.8 km away - Rooftop solar
David Lloyd Leisure Limited, Corner Of Weigall Road - Solar PanelsApproved, not yet built · 210 kW
Sept 2023
5.7 km away - Battery storage
Manor Farm, Dartford Road - Energy Storage SystemPlanning application in · 212 MW
Jun 2025
5.8 km away - Rooftop solar
Bexleyheath Superbowl, Albion Road - Solar PanelsApproved, not yet built · 190 kW
Oct 20236.2 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
- Major, planned
Park Road, ChislehurstHighway repair and maintenance works · TRANSPORT FOR LONDON (TFL) · Multi-way signals
Jan 2027 to Feb 2027
700 m away - Major, planned
High Street, ChislehurstHighway repair and maintenance works · TRANSPORT FOR LONDON (TFL) · Multi-way signals
Jan 2027 to Feb 2027
750 m away - Major, planned
Bromley Lane, ChislehurstHighway improvement works · LONDON BOROUGH OF BROMLEY · Multi-way signals
Oct 2026 to Nov 2026
800 m away - Minor
Camden Grove, ChislehurstUtility asset works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
8.9 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
10.2 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
10.9 km away - Decideddecided Nov 2025
11.0 km away - Decideddecided Sept 2014
16.5 km away - Decideddecided Mar 2025
21.2 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
Transport schemes within 20 km
- Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
11.4 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
15.8 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
16.7 km away
ApprovedArran, Heathley End, BR7 6ABDemolition of existing chimneys and construction of part one/two storey front and rear extensions, loft conversion with front and rear dormers, addition of rooflights to side, roof alterations to include increase in ridge height and elevational alterations.Bromley 25/00353/FULL6 · Householder
Feb 2025
400 m away Not Required39, Woodside Avenue, BR7 6BXSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 4m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior ApprovalBromley 25/00405/HHPA · Prior Approval
Feb 2025
450 m away Running nearest: Riverside Resource Recovery Facility (RRRF) (energy from waste, 6.1 km); Thameside DC (rooftop solar, 8.8 km); Twin Tumps Way - Solar Panels (rooftop solar, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.