Within 2 km, around Orpington South in Bromley. Building, planning, schools, transport, prices and crime.
77new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.1%like-for-like prices in Orpington South, 2024 → 2025 (council +1.6%)
-40%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
18 new homes completedflats · Mar 2026 – Oct 2026
Oct 2026 1.5 km away
New homes
35 new homes completed25 flats, 10 houses · Jan 2026
Jan 2026 1.3 km away
New homes
10 new homes completedflats · Oct 2025
Oct 2025 1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 14 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
8net new homes in approved schemes since 2023
Application Under Consideration
34, Ryarsh Crescent, BR6 9SQDemolition of existing rear extension. Proposed single storey rear extension, roof enlargement incorporating loft conversion with rear dormer and front rooflight.Bromley 25/02120/FULL6 · Householder
Jun 2025 500 m away
Application Under Consideration
27, Repton Road, BR6 9HRGarage conversion to habitable room, construction of single storey rear extension with flat roof and top of parapet wall with steel railing and obscure glass and elevational alterations.Bromley 25/01850/FULL6 · Householder
May 2025 300 m away
Application Under Consideration
3, Haileybury Road, BR6 9EZDemolition of garage to construct a two-storey pitched roof side extension.Bromley 25/01634/FULL6 · Householder
May 2025 450 m away
Application Under Consideration
8, Mitchell Road, BR6 9TPMitchell Road Condition DischargeBromley 24/01873/CONDIT · All Other
May 2025 400 m away
Application Under Consideration
39, Charterhouse Road, BR6 9EJDemolition of existing conservatory and construction of a single storey side/rear extension with a part first floor side/rear extension above. Elevational alterations include removal of chimney and replacing the flat roof with a hipped roofBromley 25/01801/FULL6 · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
124, Repton Road, BR6 9HXDemolition of shed construction of outbuilding to rear of garden (Lawful Development Certificate Existing)Bromley 25/01770/ELUD · All Other
12, Trenear Close, BR6 9XTDemolition of chimney, garage conversion to habitable room, single storey side extension, single storey rear extension, loft conversion including two side roof dormers, rear garden patio alterations and elevational alterations.Bromley 25/01066/FULL6 · Householder
Apr 2025 50 m away
Approved
60, Sandhurst Road, BR6 9HWLoft conversion comprising hip to gable roof form alteration, rear dormer window and three roof windows to front roof slope LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01030/PLUD · All Other
Apr 2025 300 m away
Not Required
14, Borkwood Park, BR6 9LDSingle storey rear extension, extending beyond the rear wall of the original house by 4.35m, for which the maximum height would be 2.88m, and for which the height of the eaves would be 2.65m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01174/HHPA · Prior Approval
Mar 2025 500 m away
Approved
10, Vancouver Close, BR6 9XRSingle storey rear and front porch extensions, alterations to existing rear extension, first floor side extension and loft conversion comprising rooflights to front and sideBromley 25/01101/FULL6 · Householder
Mar 2025 200 m away
Approved
8, Gleeson Drive, BR6 9LJNew pitched roofs to existing front and side dormers, new pitched roof dormer to side, removal of existing chimney and alterations to fenestrationBromley 25/00786/FULL6 · Householder
Mar 2025 400 m away
Approved
8, Gleeson Drive, BR6 9LJSingle storey rear extension, garage conversion including raising the roof and alterations to fenestrationBromley 25/00787/FULL6 · Householder
15, Trenear Close, BR6 9XTConversion of the existing garage into a habitable space and elevational alterations.Bromley 25/00127/FULL6 · Householder
Jan 2025 100 m away
Application Under Consideration
51, Haileybury Road, BR6 9EZRoof alterations including rear hip to gable loft conversion with front/side/rear roof windows and roof lantern.Bromley 24/04803/FULL6 · Householder
Jan 2025 500 m away
Refused
31, Vancouver Close, BR6 9XQSingle storey front/side extension, part one/two storey rear and side extension and elevational alterations.Bromley 24/04294/FULL6 · Householder
Nov 2024 300 m away
Approved
3, Repton Road, BR6 9HRSingle storey rear/side extension and front/side infill extension to existing garage.Bromley 24/04162/FULL6 · Householder
Nov 2024 400 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Avery Hill Campus, Avery Hill Road - Solar PanelsApproved, not yet built · 530 kW
Mar 2026 9.2 km away
Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 9.2 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · North of the existing Tilbury National Grid substation, off Station Road, Thurrock, RM18 8UL
M25 junction 28 improvementsHighways · To the west of Brentwood in Essex, at the intersection of the M25, the A12 and the A1023
decided May 2022 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.