Within 2 km, around Keston in Bromley. Building, planning, schools, transport, prices and crime.
47new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.6%like-for-like prices in Keston, 2024 → 2025 (council +1.6%)
+7%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
35 new homes completed25 flats, 10 houses · Jan 2026
Jan 2026 1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
5net new homes in approved schemes since 2023
Application Under Consideration
36, Meadow Way, BR6 8LWErection of outbuilding and swimming pool LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01925/PLUD · All Other
Jun 2025 300 m away
Application Under Consideration
64, Lovibonds Avenue, BR6 8EWKing 1777Bromley 25/02102/PLUD · All Other
Jun 2025 300 m away
Application Under Consideration
46, Lovibonds Avenue, BR6 8EWGarage conversion to habitable room, construction of single storey rear infill extension, single storey front extension and elevational alterationsBromley 25/02094/FULL6 · Householder
Jun 2025 350 m away
Application Under Consideration
2, Percival Road, BR6 8HLDemolition of conservatory and open porch and construction of a two-storey side and rear wraparound extension, with new side and front roof dormers, new internal porch to the front elevation, and internal and elevational alterations.Bromley 25/01759/FULL6 · Householder
26, Meadow Way, BR6 8LWMaple tree on right side boundary in rear garden - Reduce crown by 2.5m. Conifer tree on right side boundary in rear garden - Reduce by 3m. Cedar tree - Reduce lateral branches back to previous cut points.Bromley 25/01777/TREE · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
120hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Thames Water
Cso At Crofton Roadinto Kyd Brook31 spills, 120 hours in 2025
Ground works and associated fibrous root pruning to install a root barrier 14m in length and 4m in depth. SUBJECT TO TPO 710 (26.2.1991)
Bromley 25/01594/TPO · All Other
Apr 2025 100 m away
Application Under Consideration
5, The Glen, BR6 8LPErection of replacement summerhouse to rear.Bromley 25/01229/FULL6 · Householder
Apr 2025 450 m away
Application Under Consideration
45, Oak House, Park Avenue, BR6 8LHConversion of existing garage to habitable space. Construction of part one/two storey front and rear extensions, including removal of existing roof and replacement with an enlarged roof and rear dormer extensions to provide habitable accommodation at second floor level, solar panels and associated landscaping works including enlargement and re-siting of outdoor swimming pool.Bromley 25/00525/FULL6 · Householder
Feb 2025 300 m away
No Objection to Proposal (OBS only)
18, Meadow Way, BR6 8LWSilver Birch tree - Remove.Bromley 25/00556/TREE · All Other
Feb 2025 450 m away
No Objection to Proposal (OBS only)
Bracken, Hazel Grove, BR6 8LUx3 Leylandii trees in the rear garden - Fell.Bromley 25/00514/TREE · All Other
Feb 2025 350 m away
Approved
25, Grasmere Gardens, BR6 8HEDemolition of existing conservatory and shed and construction of single storey rear extension with elevational alterations. Construction of outbuilding to rear garden.Bromley 25/00244/FULL6 · Householder
Jan 2025 50 m away
Approved
122, Lovibonds Avenue, BR6 8ENDemolition of garage, construction of a single storey side and part one/two storey rear extensions, new open porch with pitched roof and elevational alterationsBromley 25/00147/FULL6 · Householder
Jan 2025 500 m away
Approved
16, Henson Close, BR6 8PNGarage conversion to habitable room and front elevational alterations PROPOSED LAWFUL DEVELOPMENT CERTIFICATEBromley 25/00096/PLUD · All Other
Jan 2025 500 m away
Approved
17, Pondfield Road, BR6 8HJSingle storey front/side infill extensions, first floor side extension with front, side and rear dormer windows and addition of skylightBromley 24/04799/FULL6 · Householder
Jan 2025 400 m away
No Objection to Proposal (OBS only)
37, Parkdene, Park Avenue, BR6 8LHH2 Leyland Cypress - Reduce the overall height by up to 1.5m and trim previous seasons regrowth on garden side face. H3 Cypress on rear right hand boundary - Reduce the overall height by up to 1m and shape into a rounded conical shape (to blend into the neighbouring hedge on the right hand side with a rounded edge not a flat hedge face). H4 Cypress on rear right hand boundary - Reduce the overallBromley 24/04740/TREE · All Other
Dec 2024 350 m away
Approved
299, Crofton Road, BR6 8EZSingle storey side/rear extensions including garage conversion, front porch, alterations to front driveway to form additional parking and refuse and cycle store and elevational alterations.Bromley 24/04706/FULL6 · Householder
Dec 2024 100 m away
Pre-application Advice Case Completed
17, Pondfield Road, BR6 8HJSecond telephone consultation following refusal of application 24/03290/FULL6.Bromley 24/04653/PRETEL · All Other
Dec 2024 400 m away
Approved
24, Meadow Way, BR6 8LWSingle storey rear extension with light lantern and single storey side extension.Bromley 24/04536/FULL6 · Householder
Dec 2024 400 m away
Approved
79, Lovibonds Avenue, BR6 8EPDemolition of existing garage and conservatory and erection of double storey side extension and construction of the first floor with pitched roof, new front porch and elevational alterations.Bromley 24/04523/FULL6 · Householder
Dec 2024 250 m away
Approved
8, Fairbank Avenue, BR6 8JZDemolition of existing detached garage and construction of single storey side/rear extension, front porch and relocation of side access gate.Bromley 24/04504/FULL6 · Householder
Dec 2024 450 m away
Refused
The Chimes, Hazel Grove, BR6 8LUT1 Oak - Reduce height by 2m. SUBJECT TO TPO 2455 ((23.12.2011)Bromley 24/04560/TPSPLD · All Other
Nov 2024 400 m away
Approved
The Chimes, Hazel Grove, BR6 8LUT1 Oak - Reduce lateral branches by up to 2m and height by up to 1.5m. remove epicormic growth on trunk. SUBJECT TO TPO 2455 ((23.12.2011)Bromley 24/04560/TPO · All Other
Nov 2024 400 m away
Approved
The Princess Royal University Hospital, Farnborough Common, BR6 8NDReplacement of all existing lampposts on the site with new Skylite LED lampposts, and addition of 6 further lampposts, replacement of existing wall mounted lights and existing bollards.Bromley 24/03101/FULL1 · All Other
Nov 2024 400 m away
Approved
10, Red Oak Close, BR6 8HHSingle storey front porch extension, hipped to gable loft conversion, rear roof dormer and two front roof lights. LAWFUL DEVEOPMENT CERTIFICATE (PROPOSED)Bromley 24/04392/PLUD · All Other
Nov 2024 300 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 7.3 km away
Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023 7.4 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · East of Gravesend and Tilbury
decided Mar 2025 25.0 km away
Decided
Thurrock Flexible Generation PlantGenerating Stations · North of the existing Tilbury National Grid substation, off Station Road, Thurrock, RM18 8UL
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.