School closed: Bishop Challoner SchoolOther independent school, other independent school (closure)
Jul 2025 1.9 km away
New homes
14 new homes completedflats · Jun 2025
Jun 2025 1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
0net new homes in approved schemes since 2023
Application Under Consideration
53, Broadoaks Way, BR2 0UAT1 Cherry Plum Prunus cerasifera - Remove.Bromley 25/02109/TREE · All Other
Jun 2025 400 m away
Application Under Consideration
127, Goodhart Way, BR4 0EUProposing to construct a 5m Full-Width Single-Storey Rear Extension with Three Sky Lanterns and a Gable Roof Dormer Loft Conversion with Two Front Skylights.Bromley 25/02042/FULL6 · Householder
Jun 2025 150 m away
Application Under Consideration
145, Goodhart Way, BR4 0EUSingle storey rear extension LAWFUL DEVLOPMENT CERTIFICATE (EXISTING)Bromley 25/02077/ELUD · All Other
May 2025 100 m away
Approved
12, Pickhurst Park, BR2 0UFSingle storey rear extension with alterations to existing extension roof and elevational alterations.Bromley 25/01422/FULL6 · Householder
May 2025 300 m away
Application Under Consideration
19, Hayes Chase, BR4 0HUGarage conversion single storey front extension. Part one storey/two storey side/rear extensions. Roof enlargement and loft conversion with rear dormer/Juliet balcony with roof lights to side and elevational changes.Bromley 25/01220/FULL6 · Householder
May 2025 50 m away
Approved
68, Pickhurst Park, BR2 0TWDemolition of conservatory and construction of single storey rear extension for which Prior Approval was not required under 25/00609/HHPA and elevational alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01371/PLUD · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
265, Pickhurst Lane, BR4 0HJSingle storey rear extension, single storey side and front porch extension, first floor side extension, hipped to gable loft conversion including rear roof dormer, three front roof lights and elevational alterations.Bromley 25/01041/FULL6 · Householder
Apr 2025 300 m away
Not Required
19, Hayes Chase, BR4 0HUSingle storey rear extension, extending beyond the rear wall of the original house by 7.00m, for which the maximum height would be 3.70m, and for which the height of the eaves would be 2.65m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01377/HHPA · Prior Approval
Apr 2025 100 m away
Approved
86, Hayes Chase, BR4 0JADemolition of existing detached garage. Construction of part one/two storey front/side/rear extension including formation of new porch.Bromley 25/01044/FULL6 · Householder
Apr 2025 350 m away
Approved
44, Woodlea Drive, BR2 0UQDemolition of chimneys. Garage conversion into habitable room with first floor front/side extension, part one/two storey rear extension and elevational alterations. Loft conversion with rear dormer and three front roof lights.Bromley 25/00753/FULL6 · Householder
Apr 2025 250 m away
Approved
78, Goodhart Way, BR4 0EYDemolition of existing conservatory and construction of single storey rear extension.Bromley 25/01137/FULL6 · Householder
Mar 2025 400 m away
Approved
120, Goodhart Way, BR4 0EZHip to gable loft conversion with rear dormer, side roof window and two front rooflights. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01131/PLUD · All Other
Mar 2025 250 m away
Pre-application Advice Case Completed
51, Barnfield Wood Road, BR3 6STTelephone consultation following refusal of application 24/04811/FULL6.Bromley 25/01145/PRETEL · All Other
Mar 2025 300 m away
Refused
68, Pickhurst Park, BR2 0TWHip to gable loft conversion with front rooflights, rear dormer and elevational alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/00841/PLUD · All Other
Mar 2025 300 m away
Approved
1, Top Park, BR3 6RUDemolition of existing rear extension. Construction of part one/two storey rear/side extension and elevational alterations.Bromley 25/00817/FULL6 · Householder
Mar 2025 450 m away
Approved
103, Elwill Way, BR3 6RXT1 Oak in front garden - 2-2.5m crown reduction back to previous reduction points and crown lift by 1-1.5m. SUBJECT TO TPO 1701 (28.7.2000) T2 & T3 Ash in rear garden - 3.5-4m crown reduction back to previous reduction points. T4 - T15 Oak in rear garden - 3-3.5m crown reduction back to previous reduction points. T16 -T17 Hawthorn in rear garden - 3-3.5m crown reduction back to previous reductionBromley 25/00949/TPO · All Other
Mar 2025 350 m away
Application Under Consideration
31, Woodlea Drive, BR2 0UGTelephone consultation following refusal of application 24/03164/FULL6.Bromley 25/00842/PRETEL · All Other
Mar 2025 200 m away
Refused
23, Broadoaks Way, BR2 0UAInstallation of six photovoltaic panels to side roof (RETROSPECTIVE).Bromley 25/00387/FULL6 · Householder
Mar 2025 500 m away
Not Required
68, Pickhurst Park, BR2 0TWSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3.75m, and for which the height of the eaves would be 3.75m (42 Day Notification for Householder Permitted Development Prior ApprovalBromley 25/00609/HHPA · Prior Approval
Feb 2025 300 m away
Application Under Consideration
1, Top Park, BR3 6RUTelephone consultation following refusal of application 24/04721/FULL6.Bromley 25/00595/PRETEL · All Other
Feb 2025 450 m away
Approved
99, Hayes Chase, BR4 0HYTwo storey side/rear extension, conversion of existing garage into habitable room, part one/two storey front extension and front and side elevational alterations.Bromley 25/00196/FULL6 · Householder
Jan 2025 400 m away
Not Required
77, The Crescent, BR4 0HDSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3.89m, and for which the height of the eaves would be 2.54m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/00209/HHPA · Prior Approval
Jan 2025 400 m away
Refused
1A, Woodlea Drive, BR2 0UGDemolition of existing side extension and chimney, construction of part one/two storey front/side and rear extension, alterations to the roof include raising the ridge height, loft conversion comprising rear dormer and rooflights to front, elevational alterations, together with conversion of the existing dwelling into 5 self/custom build flats (2 x. two-bedroom, 1 x one bedroom and 2 x. Studio flaBromley 25/00010/FULL1 · All Other · 4 homes proposed
Jan 2025 300 m away
Refused
51, Barnfield Wood Road, BR3 6STRemoval of existing chimneys, roof alterations including raised ridge height, loft conversion comprising 2 No rear dormers (1 with Juliet balcony) and rooflights to front.Bromley 24/04811/FULL6 · Householder
Dec 2024 300 m away
Approved
51, Barnfield Wood Road, BR3 6STProposed garage conversion, facade alterations and all associated works. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/04812/PLUD · All Other
Dec 2024 300 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
John Ruskin Sixth form College, Selsdon Park Road - Solar PanelsApproved, not yet built · 340 kW
May 2026 5.1 km away
Battery storage
Layhams Road - Battery Storage FacilityApproved, not yet built · 250 MW
Mar 2026 5.7 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Nov 2026 700 m away
Standard
Marden Avenue, HayesUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away
Minor
Goodhart Way, West WickhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 50 m away
Minor
Hayes Chase, West WickhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 150 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Dams and Reservoirs · From Mogden Sewage Treatment Works to the River Thames upstream of Teddington Weir
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 27.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.