School closed: Wickham Court SchoolOther independent school, other independent school (closure)
May 2023 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
0net new homes in approved schemes since 2023
Not Required
94, Wickham Chase, BR4 0BNSingle Storey Rear Extension with some Internal & External Alterations Demolitions.Bromley 25/02024/HHPA · Prior Approval
May 2025 300 m away
Application Under Consideration
The Bungalow, Hayes Mead Road, BR2 7HRThe Bungalow, Hayes Mead Road, Bromley Kent Br2 7HrBromley 24/00512/RECON · All Other
May 2025 450 m away
Application Under Consideration
16, Pickhurst Rise, BR4 0ALHip to gable loft conversion with rear dormer and front rooflights LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01676/PLUD · All Other
May 2025 400 m away
Application Under Consideration
16, Pickhurst Rise, BR4 0ALGround floor rear extension and conversion of detached garage to habitable rooms and new roofBromley 25/01675/FULL6 · Householder
May 2025 400 m away
Application Under Consideration
40, The Mead, BR4 0BBSingle storey side/rear extension, removal of chimney stack and conversion of garage to habitable useBromley 25/01935/FULL6 · Householder
May 2025 250 m away
Application Under Consideration
West Wickham Methodist Church And Church Hall, Hawes Lane, BR4 9AAUse as a day school for pupils aged 5-18 years, operating during normal school hours and term times. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01718/PLUD · All Other
May 2025 400 m away
Approved
111, Hawes Lane, BR4 9AAFirst floor side extension
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
9, Hayes Mead Road, BR2 7HRFirst floor extension to create additional storey, addition of roof lanterns to rear/side extension and elevational alterations including Juliet balcony to rear.Bromley 25/01400/FULL6 · Householder
Apr 2025 400 m away
Approved
8A, The Drive, BR4 0EPErection of first floor front extensionBromley 25/00881/FULL6 · Householder
Mar 2025 300 m away
Not Required
24, Silver Lane, BR4 0SQSingle storey rear extension, extending beyond the rear wall of the original house by 5m, for which the maximum height would be 3m, and for which the height of the eaves would be 2.7m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/00761/HHPA · Prior Approval
Mar 2025 500 m away
Approved
6, Pickhurst Rise, BR4 0ALConstruction of single storey rear extension with flat roofBromley 25/00453/PLUD · All Other
8, Linden Leas, BR4 0SELoft conversion comprising rear dormer with Juliet balcony and rooflights to front. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/04804/PLUD · All Other
Dec 2024 450 m away
Approved
7, Wickham Chase, BR4 0BDDemolition of conservatory and rear extension, construction of single storey rear extension and elevational alterations.Bromley 24/04474/FULL6 · Householder
Nov 2024 250 m away
Not Required
152, Pickhurst Rise, BR4 0AWSingle storey rear extension, extending beyond the rear wall of the original house by 4.2m, for which the maximum height would be 3.8m, and for which the height of the eaves would be 2.6m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 24/04308/HHPA · Prior Approval
Nov 2024 50 m away
Refused
230, Pickhurst Rise, BR4 0AUConversion of an existing outbuilding into a granny annexe.Bromley 24/04170/FULL6 · Householder
52, Pickhurst Rise, BR4 0ALSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3.5m, and for which the height of the eaves would be 2.66m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 24/03844/HHPA · Prior Approval
Oct 2024 250 m away
Approved
152, Pickhurst Rise, BR4 0AWCommon Beech - Reduce the height and spread by up to 2m. SUBJECT TO TPO 398 (30.9.1988)Bromley 24/03786/TPO · All Other
Oct 2024 50 m away
Approved
47, Wickham Chase, BR4 0BGSingle storey rear extension with patio/steps and elevational alterations.Bromley 24/03721/FULL6 · Householder
Oct 2024 200 m away
Approved
St Mary Of Nazareth Church, The Avenue, BR4 0DXDisplay of 2x freestanding post mounted non-illuminated board signs.Bromley 24/03325/ADV · All Other
Sept 2024 400 m away
Approved
50, Langley Way, BR4 0DRGround floor rear extension and internal alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/03541/PLUD · All Other
Sept 2024 150 m away
Approved
53, Wickham Chase, BR4 0BGA hip to gable loft conversion with rear dormer and front rooflight and single storey rear extension. LAWFUL DEVELOPMENT CERTIFICATE (EXISTING)Bromley 24/03419/ELUD · All Other
Sept 2024 250 m away
Not Required
7, Pickhurst Rise, BR4 0AASingle storey rear extension, extending beyond the rear wall of the original house by 4.3m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 24/03452/HHPA · Prior Approval
Sept 2024 400 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025 5.1 km away
Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 5.4 km away
Running nearest: Beddington EfW (energy from waste, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.