What's changing near BR3 5ED
Within 2 km, around Beckenham East & Kelsey Park in Bromley. Building, planning, schools, transport, prices and crime.
314new homes completed within 2 km, last 2 years
36homes given permission on brownfield sites since 2021
+0.4%like-for-like prices in Beckenham East & Kelsey Park, 2024 → 2025 (council +1.6%)
-17%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- School closed
School closed: Kings LondonOther independent school, other independent school (closure)
Mar 2026
1.8 km away - New homes
9 new homes completedflats · Mar 2026
Mar 2026
900 m away - New homes
11 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
850 m away - New homes
20 new homes completedflats · Jan 2026
Jan 2026
1.4 km away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
1.4 km away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
1.4 km away - New homes
20 new homes completedflats · Oct 2024 – Nov 2025
Nov 2025
550 m away - New homes
20 new homes completedhouses · Jul 2025 – Oct 2025
Oct 2025
1.1 km away - New homes
8 new homes completedflats · Sep 2025
Sept 2025
1.1 km away - New homes
6 new homes completedflats · Sep 2025
Sept 2025
900 m away - New homes
9 new homes completedflats · May 2025 – Aug 2025
Aug 2025
1.0 km away - New homes
40 new homes completedflats · Jan 2025 – Jul 2025
Jul 2025
1.2 km away
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
6net new homes in approved schemes since 2023
- Application Under Consideration
9, St Clare Court, Foxgrove Avenue, BR3 5BGConversion of lower ground floor storage into a studio unit apartment. New rear steps leading to flat entrance and communal garden area and elevational alterations.Bromley 25/01891/FULL1 · All Other · 1 homes proposed
Jun 2025
400 m away - Application Under Consideration
36, The Mead, BR3 5PFHip to gable loft conversion, erection of a rear dormer and installation of two rooflights to the front roof plane.Bromley 25/01997/FULL6 · Householder
Jun 2025
400 m away - Application Under Consideration
Langstead Wood House, Westgate Road, BR3 5DEAsh tree - Remove. SUBJECT TO TPO 1682 (15.3.2000)Bromley 25/01845/TPO · All Other
May 2025
350 m away - Refused
99B, Albemarle Road, BR3 5HPLondon Plane tree - Remove. SUBJECT TO TPO 2064 (30.3.2005)Bromley 24/04448/TPO · All Other
Apr 2025
350 m away - Withdrawn
25, West Oak, BR3 5EZAsh tree at rear - Remove. SUBJECT TO TPO Be 1 1961Bromley 25/01649/TPO · All Other
Apr 2025
300 m away - Approved
42, The Mead, BR3 5PFDemolition of side conservatory and chimney, construction of single storey rear/side extension.Bromley 25/01157/FULL6 · Householder
Apr 2025
400 m away - Application Under Consideration
82, Beckenham Place Park, BR3 5BTProposed single storey front extension, single storey rear extension with two storey side extension to the existing house. New sunken swimming pool to a landscaped garden with adjacent single storey pool house and pool plant room. New single storey gym building to the rear garden to include addition of solar panels, elevational alterations to the main house, new electric gate and alterations to th
23homes extended 2021–2025, typically adding 27 m²
42since energy certificates began (2008)
1in BR3 5ED itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
36 planned, approved or being built and 3 running (62 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
1.5 km away - Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
1.7 km away - Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
2.0 km away - Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
2.3 km away - Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
2.3 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
2.3 km away - Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
3.0 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
3.6 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 2026
3.9 km away - Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 20234.8 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
8.2 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
10.2 km away - Decideddecided Sept 2014
12.9 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
15.5 km away - Decideddecided Nov 2025
15.8 km away - Decideddecided Apr 2014
21.5 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
11.1 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
11.8 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
14.9 km away - TransportMay 2022
16.2 km away
Not Required105, Foxgrove Road, BR3 5DASingle storey rear extension, extending beyond the rear wall of the original house by 6.00m, for which the maximum height would be 3.83m, and for which the height of the eaves would be 2.67m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/00675/HHPA · Prior Approval
Feb 2025
200 m away Running nearest: SELCHP ERF (energy from waste, 8.4 km); Thameside DC (rooftop solar, 9.4 km); Beddington EfW (energy from waste, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.