Looking around…
What's changing near BR3 4RP
Within 2 km, around Clock House & Cator Park in Bromley. Building, planning, schools, transport, prices and crime.
306new homes completed within 2 km, last 2 years
201homes given permission on brownfield sites since 2021
+4.0%like-for-like prices in Clock House & Cator Park, 2024 → 2025 (council +1.6%)
+19%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
5 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026
0 m away - New homes
38 new homes completedflats · Jun 2026
Jun 2026
1.4 km away - School closed
School closed: Kings LondonOther independent school, other independent school (closure)
Mar 2026
550 m away - New homes
5 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026
1.6 km away - New homes
9 new homes completedhouses · Mar 2026
Mar 2026
1.6 km away - New homes
11 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
1.6 km away - New homes
5 new homes completedflats · Jan 2026
Jan 2026
100 m away - New homes
20 new homes completedflats · Jan 2026
Jan 2026
1.1 km away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
1.1 km away - New homes
8 new homes completedflats · Sep 2025
Sept 2025
1.3 km away - New homes
6 new homes completedflats · Sep 2025
Sept 2025
1.4 km away
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
54net new homes in approved schemes since 2023
- Application Under Consideration
Harris Primary Academy Kent House, High Street, SE20 7QRDemolition of the Nursery and Reception block and replacement with soft landscaping, replacement of windows and doors to the main building school hall, replacement of timber weatherboarding with fibre cement weatherboarding to modular class room and erection of new canopy structures.Bromley 25/01878/FULL1 · All Other
Jun 2025
300 m away - Application Under Consideration
22, Barnmead Road, BR3 1JERemoval of existing garage and replacement with single storey side extension, projection of existing side bay window and elevational alterations including connection to existing rear/side return extension, with associated worksBromley 25/01994/FULL6 · Householder
Jun 2025
150 m away - Application Under Consideration
1B, Reddons Road, BR3 1LYSmall Oak tree at 15 Kings Hall Road on border of 1b Reddons Road - Prune all overhanging branches. Young Cherry trees at 13 Kings Hall Road on border of 1b Reddons Road - Prune all overhanging branches. Young Lime tree at 11 Kings Hall Road on border of 1b Reddons Road - Prune all overhanging branches.Bromley 25/02095/TREE · All Other
Jun 2025
450 m away - No Objection to Proposal (OBS only)
36B, Kings Hall Road, BR3 1LSAll trees are on Network Rail land and overhang the boundary into 3rd party. Resident requires all trees to be brought back to just within the NR boundary. T1 Birch - 1m lateral reduction. T2/T3/T4 Regenerated Sycamore - Removal. T5 Mature Sycamore - 1.5m lateral reduction. T6 Immature Oak - 1m reduction on 3 branches only.Bromley 25/02004/TREE · All Other
May 2025
300 m away - Application Under Consideration
31, Ravenscroft Road, BR3 4TPLoft conversion with rear dormer and front rooflights LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)
65homes extended 2021–2025, typically adding 29 m²
96since energy certificates began (2008)
2in BR3 4RP itself
- Extendedcertificate 2025
- Extendedcertificate 2024
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 2 running (61 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
600 m away - Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
1.5 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
1.7 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
2.2 km away - Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 2023
3.4 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
3.4 km away - Rooftop solar
Selhurst Traincare Depot, Selhurst Road - Solar PanelsApproved, not yet built · 1 MW
Nov 2025
3.5 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 2026
3.8 km away - Rooftop solar
Dulwich College, College Road - Solar panelsApproved, not yet built · 660 kW
Dec 2024
4.2 km away - Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
4.2 km away
Road and street works within 1 km
10 permitted works running now or planned, 1 of them major.
- Major, planned
Forster Road, BeckenhamHighway improvement works · LONDON BOROUGH OF BROMLEY · Road closure
Oct 2026 to Oct 2026
900 m away - Standard
Blandford Road, BeckenhamUtility asset works · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away - Standard
Elmers End Road, PengeNew service connection · SOUTHERN GAS NETWORKS PLC · Two-way signals
Jan 2027 to Jan 2027
900 m away - Minor
Kings Hall Road, BeckenhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
Aldersmead Road, BeckenhamUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Beckenham Road, BeckenhamDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026
500 m away - Minor
Parish Lane, PengeDisconnection or alteration of supply · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Nov 2026
800 m away - Minor
High Street, PengeUtility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away - Minor
Maple Road, PengeUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
900 m away - Minor
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
9.0 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
11.0 km away - Decideddecided Sept 2014
12.0 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
17.4 km away - Decideddecided Nov 2025
17.7 km away - Pre-applicationapplication due March 2027
20.9 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
9.7 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
10.2 km away - TransportMay 2022
14.8 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
16.5 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
19.1 km away
New homes
9 new homes completedflats · May 2025 – Aug 2025
Aug 2025
1.4 km away
New homes40 new homes completedflats · Jan 2025 – Jul 2025
Jul 2025
1.3 km away New homes9 new homes completedflats · May 2025
May 2025
1.5 km away New homes8 new homes completedflats · May 2025
May 2025
1.9 km away New schoolApr 2025
1000 m away New homes5 new homes completedflats · Mar 2025
Mar 2025
950 m away New homes37 new homes completedflats · Nov 2024 – Jan 2025
Jan 2025
1.7 km away New homes16 new homes completedflats · Nov 2024
Nov 2024
1.3 km away New homes5 new homes completedflats · Nov 2024
Nov 2024
1.6 km away New homes7 new homes completedflats · Nov 2024
Nov 2024
1.3 km away Planning permissionNov 2023
1.7 km away Planning permissionMar 2022
2.0 km away Planning permissionSept 2021
1.8 km away Planning permissionSept 2021
2.0 km away Planning permissionMay 2021
1.8 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 37 postcodes nearby had new homes completed in the last two years.
Bromley 25/01917/PLUD · All Other
May 2025
150 m away
Application Under Consideration110, Beckenham Road, BR3 4RHMinor Material Amendment under S73 in order to Vary Condition 2 of Planning ref: 15/00970/RECON & 15/00970/RECON1 in order to allow the use to operate between the hours of 12:00 - 21:00 hours Mondays to Saturdays and 12:00 - 20:00 on Sundays and Bank Holidays on a permanent basisBromley 15/00970/RECON2 · All Other
May 2025
200 m away Application Under Consideration103, Avenue Road, BR3 4RXLoft conversion with rear dormer and front roof lights (Lawful Development Certificate Proposed)Bromley 25/01434/PLUD · All Other
May 2025
350 m away Refused6, Rowden Road, BR3 4NALoft dormer extension to rear of main roof with addition of 2no. roof windows to front facing roof slope and electric opening flat rooflight. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01218/PLUD · All Other
Apr 2025
450 m away Approved4, Sultan Street, BR3 4QSSingle storey rear extension, single storey side extension and single storey front extension and elevational alterations.Bromley 25/01216/FULL6 · Householder
Apr 2025
400 m away Approved16, Rowden Road, BR3 4NALoft conversion with rear dormer. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01224/PLUD · All Other
Apr 2025
450 m away Approved69, Kings Hall Road, BR3 1LRErection of a single storey garden room to rear of gardenBromley 25/01166/FULL6 · Householder
Apr 2025
400 m away Approved35, Kenilworth Road, SE20 7QGLoft conversion with L shape rear dormer and front roof light. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01049/PLUD · All Other
Apr 2025
400 m away Application Under Consideration83, Avenue Road, BR3 4RXElevational alterations including external render to front, side and rear elevations including associated works to the eaves, repair of rear flat roof and replacement of rear slate roof. Enclosure of existing undercroft with new slab floor, rear and entrance doors and creation of recessed porch to front. Landscaping to front garden including new driveway and repaired boundary walls.Bromley 25/01341/FULL6 · Householder
Apr 2025
400 m away Application Under Consideration34A, Kings Hall Road, BR3 1LUSingle story side and rear extensions, garage conversion, raising garage roof, alterations to first floor rear bay and a new balcony with privacy screen and elevational alterations.Bromley 25/00955/FULL6 · Householder
Apr 2025
350 m away Closed243, 247, Beckenham Road, BR3 4RPDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/03588/CUETC3: Condition 2: Acoustic specification documentBromley 24/03588/CONDIT · All Other
Mar 2025
50 m away Approved243, 247, Beckenham Road, BR3 4RPElevational alterations on the ground level to include change of fenestration and two additional door openings on the rear elevation, and the creation of 2 x lightwells to the basement levelBromley 25/00990/FULL1 · All Other
Mar 2025
50 m away Approved83, Birkbeck Road, BR3 4SWPart demolition of single storey rear outrigger and construction of single storey side/rear extension, new pitched roof to front bay , elevational alterations including replacement windows and render wall finish.Bromley 25/01018/FULL6 · Householder
Mar 2025
300 m away Approved83, Birkbeck Road, BR3 4SWLoft conversion with front roof lights and rear dormer with a Juliet balcony. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01019/PLUD · All Other
Mar 2025
300 m away Approved50, Churchfields Road, BR3 4QWSingle storey rear extensionBromley 25/01000/FULL6 · Householder
Mar 2025
250 m away Approved35, Birkbeck Road, BR3 4SLLoft conversion with rear dormer/extension over existing rear outrigger with Juliet balcony and 2 rooflights in front roof slope PROPOSED LAWFUL DEVELOPMENT CERTIFICATEBromley 25/00756/PLUD · All Other
Mar 2025
150 m away Approved84B, Avenue Road, BR3 4SALoft conversion including rear dormer and front rooflights, installation of a first-floor roof terrace and balustrade on the existing rear outriggerBromley 25/00866/FULL1 · All Other
Mar 2025
400 m away Approved15, Ravenscroft Road, BR3 4TPSingle storey rear extensionBromley 25/00687/FULL6 · Householder
Feb 2025
150 m away No Objection to Proposal (OBS only)54, Barnmead Road, BR3 1JET1 Cherry - Fell to ground level.Bromley 25/00549/TREE · All Other
Feb 2025
200 m away Approved92, Barnmead Road, BR3 1JDAlterations to driveway to include gravel surface, addition of granite sets, a flowerbed, concrete steps and new bin store.Bromley 25/00210/FULL6 · Householder
Feb 2025
250 m away Approved74, Barnmead Road, BR3 1JDReplacement of windows at front of house.Bromley 24/04486/FULL6 · Householder
Feb 2025
250 m away Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solarDownham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025
4.3 km away Rooftop solarPavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
4.5 km away Running nearest: Beddington EfW (energy from waste, 7.8 km); SELCHP ERF (energy from waste, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Acacia Road, BeckenhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Electric Lines · North London
decided Apr 2014
21.6 km away
Decideddecided Feb 2017
23.2 km away Pre-applicationapplication due December 2027
29.1 km away Decideddecided Mar 2025
29.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.