Within 2 km, around Clock House & Cator Park in Bromley. Building, planning, schools, transport, prices and crime.
273new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.0%like-for-like prices in Clock House & Cator Park, 2024 → 2025 (council +1.6%)
+19%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
5 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026 450 m away
New homes
38 new homes completedflats · Jun 2026
Jun 2026 1.0 km away
School closed
School closed: Kings LondonOther independent school, other independent school (closure)
Mar 2026 750 m away
New homes
5 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026 1.3 km away
New homes
9 new homes completedhouses · Mar 2026
Mar 2026 1.2 km away
New homes
11 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026 1.8 km away
New homes
5 new homes completedflats · Jan 2026
Jan 2026 400 m away
New homes
20 new homes completedflats · Jan 2026
Jan 2026 1.2 km away
New homes
18 new homes completedflats · Dec 2025
Dec 2025 1.2 km away
New homes
18 new homes completedflats · Dec 2025
Dec 2025 1.2 km away
New homes
8 new homes completedflats · Sep 2025
Sept 2025 1.5 km away
New homes
6 new homes completedflats · Sep 2025
Sept 2025 1.7 km away
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
9net new homes in approved schemes since 2023
Application Under Consideration
17, Chesham Road, SE20 7RHExtension to existing rear dormer and addition of front rooflights LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01294/PLUD · All Other
Jun 2025 500 m away
Application Under Consideration
31, Ravenscroft Road, BR3 4TPLoft conversion with rear dormer and front rooflights LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01917/PLUD · All Other
May 2025 400 m away
Application Under Consideration
London Electricity Board Depot, Churchfields RoadProvision of replacement hardstanding. LAWFUL DEVELOPMENT CERTIFICATE (EXISTING)Bromley 25/01827/ELUD · All Other
May 2025 350 m away
Application Under Consideration
103, Avenue Road, BR3 4RXLoft conversion with rear dormer and front roof lights (Lawful Development Certificate Proposed)Bromley 25/01434/PLUD · All Other
May 2025 250 m away
Application Under Consideration
194, Mackenzie Road, BR3 4SFGround floor rear extension with alterations to rear terrace with rear wall/stepsBromley 25/01339/FULL6 · Householder
Apr 2025 300 m away
Approved
4, Sultan Street, BR3 4QSSingle storey rear extension, single storey side extension and single storey front extension and elevational alterations.Bromley 25/01216/FULL6 · Householder
Apr 2025 200 m away
Application Under Consideration
83, Avenue Road, BR3 4RXElevational alterations including external render to front, side and rear elevations including associated works to the eaves, repair of rear flat roof and replacement of rear slate roof. Enclosure of existing undercroft with new slab floor, rear and entrance doors and creation of recessed porch to front. Landscaping to front garden including new driveway and repaired boundary walls.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Thames Water
South Norwood Csointo Chaffinch Brook4 spills, 5 hours in 2025
New-home postcodes with fewer than 5 homes are counted above but not listed. 37 postcodes nearby had new homes completed in the last two years.
Bromley 25/01341/FULL6 · Householder
Apr 2025 350 m away
Closed
243, 247, Beckenham Road, BR3 4RPDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/03588/CUETC3: Condition 2: Acoustic specification documentBromley 24/03588/CONDIT · All Other
Mar 2025 450 m away
Approved
243, 247, Beckenham Road, BR3 4RPElevational alterations on the ground level to include change of fenestration and two additional door openings on the rear elevation, and the creation of 2 x lightwells to the basement levelBromley 25/00990/FULL1 · All Other
Mar 2025 450 m away
Approved
83, Birkbeck Road, BR3 4SWPart demolition of single storey rear outrigger and construction of single storey side/rear extension, new pitched roof to front bay , elevational alterations including replacement windows and render wall finish.Bromley 25/01018/FULL6 · Householder
Mar 2025 250 m away
Approved
83, Birkbeck Road, BR3 4SWLoft conversion with front roof lights and rear dormer with a Juliet balcony. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01019/PLUD · All Other
35, Birkbeck Road, BR3 4SLLoft conversion with rear dormer/extension over existing rear outrigger with Juliet balcony and 2 rooflights in front roof slope PROPOSED LAWFUL DEVELOPMENT CERTIFICATEBromley 25/00756/PLUD · All Other
Mar 2025 350 m away
Approved
84B, Avenue Road, BR3 4SALoft conversion including rear dormer and front rooflights, installation of a first-floor roof terrace and balustrade on the existing rear outriggerBromley 25/00866/FULL1 · All Other
374, Blandford Road, BR3 4NNSingle storey rear extension and installation of light lantern on existing ground floor extensionBromley 25/00433/FULL6 · Householder
Feb 2025 250 m away
Approved
15, Arrol Road, BR3 4NXSingle storey rear extension (Lawful Development Certificate Proposed)Bromley 25/00450/PLUD · All Other
Feb 2025 450 m away
Approved
77, Royston Road, SE20 7QWErection of a rear roof mansard and dormer to rear outrigger, in conjunction with an enlarged first floor side window and 2x front rooflightsBromley 25/00204/FULL1 · All Other
157, Clock House Road, BR3 4JZDemolition of existing conservatory and construction of single storey rear extension.Bromley 24/04769/FULL6 · Householder
Dec 2024 450 m away
Closed
56, Arrol Road, BR3 4PADetails submitted to comply with the requirements of the following conditions relating to planning permission 24/03141/FULL1: Condition 3: Details of arrangements for storage of refuse and recyclable materials Condition 4: Details of arrangements for bicycle parkingBromley 24/03141/CONDIT · All Other
255, Beckenham Road, BR3 4RPChange of Use from Retail Shop to Cafe/Bistro (Class E). LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/04045/PLUD · All Other
Nov 2024 450 m away
Closed
249, Flat 5, Beckenham Road, BR3 4RPDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/02579/FULL1: Condition 3: Details of storage and enclosure and a management plan for refuse and recyclable materials. Condition 4: Details of resident's parking permit exemption scheme.Bromley 24/02579/CONDIT · All Other
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Knights Hill - Solar PV equipmentApproved, not yet built · 180 kW
Sept 2023 4.5 km away
Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023 4.6 km away
Running nearest: Beddington EfW (energy from waste, 7.4 km); SELCHP ERF (energy from waste, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Maple Road, PengeUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.