What's changing near BR3 4JR
Within 2 km, around Clock House & Cator Park in Bromley. Building, planning, schools, transport, prices and crime.
352new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.0%like-for-like prices in Clock House & Cator Park, 2024 → 2025 (council +1.6%)
+19%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
7 new homes completedflats · Jan 2026 – Oct 2026
Oct 2026
500 m away - New homes
5 new homes completedflats · Oct 2026
Oct 2026
1.3 km away - New homes
5 new homes completedflats · Jan 2025 – Sep 2026
Sept 2026
450 m away - New homes
38 new homes completedflats · Jun 2026
Jun 2026
1.3 km away - School closed
School closed: Kings LondonOther independent school, other independent school (closure)
Mar 2026
100 m away - New homes
5 new homes completedhouses · Jul 2025 – Mar 2026
Mar 2026
1.9 km away - New homes
9 new homes completedflats · Mar 2026
Mar 2026
1.6 km away - New homes
9 new homes completedhouses · Mar 2026
Mar 2026
1.8 km away - New homes
11 new homes completedflats · Jan 2026 – Mar 2026
Mar 2026
1.2 km away - New homes
20 new homes completedflats · Jan 2026
Jan 2026
600 m away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
650 m away - New homes
18 new homes completedflats · Dec 2025
Dec 2025
600 m away
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
55net new homes in approved schemes since 2023
- Application Under Consideration
22, Barnmead Road, BR3 1JERemoval of existing garage and replacement with single storey side extension, projection of existing side bay window and elevational alterations including connection to existing rear/side return extension, with associated worksBromley 25/01994/FULL6 · Householder
Jun 2025
400 m away - Application Under Consideration
124, Kings Hall Road, BR3 1LNProposed single storey rear extensionBromley 25/01911/FULL6 · Householder
May 2025
450 m away - Withdrawn
32, Queens Road, BR3 4JWSingle storey rear extension, extending beyond the rear wall of the original house by 6.00 m, for which the maximum height would be 4.00 m, and for which the height of the eaves would be 3.40 m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01922/HHPA · Prior Approval
May 2025
100 m away - Application Under Consideration
69, Chaffinch Road, BR3 4LXSingle storey side/rear extension and loft conversion with L shaped rear dormer with front roof lights and elevational changesBromley 25/01583/FULL6 · Householder
May 2025
300 m away - Application Under Consideration
110, Beckenham Road, BR3 4RHMinor Material Amendment under S73 in order to Vary Condition 2 of Planning ref: 15/00970/RECON & 15/00970/RECON1 in order to allow the use to operate between the hours of 12:00 - 21:00 hours Mondays to Saturdays and 12:00 - 20:00 on Sundays and Bank Holidays on a permanent basisBromley 15/00970/RECON2 · All Other
May 2025
300 m away - Application Under Consideration
65, Queens Road, BR3 4JJProposed Loft Conversion at 65 Queens Road, Beckenham BR3 4JJ
50homes extended 2021–2025, typically adding 31 m²
83since energy certificates began (2008)
1in BR3 4JR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
33 planned, approved or being built and 2 running (61 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023
250 m away - Rooftop solar
Croydon Road - Solar PanelsApproved, not yet built · 180 kW
Oct 2023
1.4 km away - Rooftop solar
David Lloyd Leisure, Stanhope Grove - Solar PanelsApproved, not yet built · 490 kW
Aug 2023
1.4 km away - Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025
2.2 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar Panels & Air Source Heat PumpsApproved, not yet built
Aug 2022
3.1 km away - Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 2023
3.3 km away - Rooftop solar
Bethlem Royal Hospital, Monks Orchard Road - Solar PanelsPlanning application in
May 2026
3.4 km away - Rooftop solar
Selhurst Traincare Depot, Selhurst Road - Solar PanelsApproved, not yet built · 1 MW
Nov 2025
3.7 km away - Rooftop solar
J Sainsbury, Walters Yard - Solar PanelsApproved, not yet built · 240 kW
Jun 2026
3.8 km away - Rooftop solar
Pavilion Leisure Centre, Kentish Way - Solar PanelsApproved, not yet built · 180 kW
Apr 2023
4.0 km away
Road and street works within 1 km
8 permitted works running now or planned, 2 of them major.
- Major, planned
Westbury Road, BeckenhamHighway improvement works · LONDON BOROUGH OF BROMLEY · Road closure
Oct 2026 to Oct 2026
700 m away - Major, planned
Forster Road, BeckenhamHighway improvement works · LONDON BOROUGH OF BROMLEY · Road closure
Oct 2026 to Oct 2026
700 m away - Standard
Blandford Road, BeckenhamUtility asset works · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Beckenham Road, BeckenhamDisconnection or alteration of supply · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026
100 m away - Minor
Kings Hall Road, BeckenhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Acacia Road, BeckenhamUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
550 m away - Minor
High Street, BeckenhamRemedial works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Minor
Aldersmead Road, BeckenhamUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-applicationapplication due March 2028
9.0 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
11.0 km away - Decideddecided Sept 2014
12.4 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
17.2 km away - Decideddecided Nov 2025
17.5 km away - Pre-applicationapplication due March 2027
21.4 km away - Decided
Transport schemes within 20 km
- Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
10.1 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
10.7 km away - TransportMay 2022
15.2 km away - Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
16.4 km away - Transport
HS2: Old Oak Common stationUnder construction (HS2 and Elizabeth line interchange)
under construction
19.5 km away
Running nearest: Beddington EfW (energy from waste, 8.0 km); SELCHP ERF (energy from waste, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.