Within 2 km, around Bromley Common in Bromley. Building, planning, schools, transport, prices and crime.
25new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-3.0%like-for-like prices in Bromley Common, 2024 → 2025 (council +1.6%)
-12%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
8 new homes completedflats · Dec 2025
Dec 2025 1.7 km away
New homes
6 new homes completedflats · Jul 2025
Jul 2025 1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
1net new homes in approved schemes since 2023
Application Under Consideration
2, Salisbury Road, BR2 9PUConstruction of single storey rear extension to be used as store room to existing shopBromley 25/01603/FULL1 · All Other
May 2025 350 m away
Application Under Consideration
14, Manor Way, BR2 8ESDemolition of existing conservatory. Construction of a single storey rear extension with a flat roof.Bromley 25/01860/FULL6 · Householder
May 2025 200 m away
Application Under Consideration
55, Parkfield Way, BR2 8AEOverhanging Lime tree - Reduce overall height by 3m and lateral branches by up to 2m, clearing branches that are rubbing on Telegraph pole and telephone wires. Remove dead wood throughout the tree. Raise the lower canopy over road to approximately 5m from ground level for clearance. SUBJECT TO TPO 751 (26.11.1991)Bromley 25/02021/TPO · All Other
May 2025 450 m away
Application Under Consideration
20, Ruskin Walk, BR2 8EPCreation of a loft conversion with a rear dormer and a Juliet balcony, side roof window and x3 rooflights at the front roof slope. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01646/PLUD · All Other
May 2025 50 m away
Application Under Consideration
20, Ruskin Walk, BR2 8EPCreation of a single storey rear extension with a roof lanternBromley 25/01647/FULL6 · Householder
May 2025 50 m away
Approved
44, Holmcroft Way, BR2 8ADDemolition of the existing outbuilding and erection of part one/two storey rear/side extension, front porch and elevational alterations.Bromley 25/01405/FULL6 · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
120hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Thames Water
Cso At Crofton Roadinto Kyd Brook31 spills, 120 hours in 2025
44, Holmcroft Way, BR2 8ADDemolition of the existing outbuilding and erection of a single-storey rear extension of the existing houseBromley 25/01289/FULL6 · Householder
Apr 2025 400 m away
Approved
33, Turpington Lane, BR2 8JARemoval of chimney and demolition of existing conservatory. Erection of two-storey side and single-storey rear extension, garage conversion to habitable space including alterations to roof from pitched to flat and elevational alterations.Bromley 25/01267/FULL6 · Householder
Apr 2025 250 m away
Not Required
264, Southborough Lane, BR2 8ASSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01500/HHPA · Prior Approval
Apr 2025 400 m away
Approved
44, Holmcroft Way, BR2 8AD2 x overhanging Lime trees - Reduce overall height by up to 3m and lateral branches by up to 2m clearing branches that are rubbing on telephone wires & remove major deadwood throughout the canopy. Crown lift - Raise the lower canopy over the road to approximately 5m from ground level for clearance. SUBJECT TO TPO 751 (26.11.1991)Bromley 25/01652/TPO · All Other
Apr 2025 400 m away
Approved
44, Holmcroft Way, BR2 8ADErection of an outbuilding to rear of garden LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01426/PLUD · All Other
Apr 2025 400 m away
Approved
44, Holmcroft Way, BR2 8ADHip to gable loft conversion with rear dormer and front roof light (Lawful Development Certificate Proposed)Bromley 25/01427/PLUD · All Other
Apr 2025 400 m away
Not Required
33, Turpington Lane, BR2 8JAsingle storey rear extension projecting 6m from the rear elevationBromley 25/01264/HHPA · Prior Approval
Apr 2025 300 m away
Closed
1, St Augustine's Avenue, BR2 8AGDetails submitted to comply with the requirements of the following conditions relating to planning permission 21/03541/FULL1: (allowed at appeal ref no APP/G5180/W/23/3330554) Condition 4- details of the finished floor level Condition 5- details of the materials Condition 6- details of tree planting Condition 7- details of landscaping Condition 9-electric vehicle charging pointsBromley 21/03541/CONDT1 · All Other
Mar 2025 400 m away
Closed
1, St Augustine's Avenue, BR2 8AGDetails submitted to comply with the requirements of the following conditions relating to planning permission 21/03541/FULL1 Condition 3 - Construction and Environmental Management Plan Condition 10 - Construction Management Plan for details of the method statement for the land within 8m of the drainage culvert.Bromley 21/03541/CONDIT · All Other
Jan 2025 400 m away
Approved
4, Cranford Mews, BR2 8GAConstruction of outbuilding to rear garden for office useBromley 24/04782/FULL6 · Householder
Jan 2025 250 m away
Refused
15, Cloisters Avenue, BR2 8ANNon-Material Amendment to previous planning permission ref 24/00621/FULL6 (granted for demolition of garage, two storey side extension, part one/two storey rear extension with rear patio area, roof alteration to include loft conversion with rear roof light): Change of 2 storey side extension to single storey side extension Removal of small first floor rear extension Change to rear elevation to incBromley 24/00621/AMD · All Other
Dec 2024 300 m away
Closed
217, Southborough Lane, BR2 8ATDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/01693/FULL1: Condition 4 - Details of the specification and performance of the kitchen extract system. Condition 5 - Details of the proposed works of sound insulation.Bromley 24/01693/CONDIT · All Other
Nov 2024 400 m away
Approved
23, Holmcroft Way, BR2 8ADRelocation of existing outbuilding and construction of annexe outbuilding ancillary to main building, for use as living accommodation by a family member.Bromley 24/02382/FULL6 · Householder
Sept 2024 350 m away
Approved
16, Manor Way, BR2 8ESLoft conversion with rear dormer and rooflight. Construction of outbuilding to rear garden. LAWFUL DEVELOPMENT CERTFICATE (PROPOSED)Bromley 24/03238/PLUD · All Other
137, Southborough Lane, BR2 8APDemolition of existing garage and erection of single storey side and rear extensionBromley 24/03061/FULL6 · Householder
Aug 2024 300 m away
Not Required
137, Southborough Lane, BR2 8APSingle storey rear extension, extending beyond the rear wall of the original house by 4m, for which the maximum height would be 3.5m, and for which the height of the eaves would be 2.99m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 24/03063/HHPA · Prior Approval
Aug 2024 300 m away
Approved
123, Southborough Lane, BR2 8APChange of use from Class E(a) shop to Thai massage therapy (sui generis)Bromley 24/02725/FULL2 · All Other
Jul 2024 350 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
The Spa, Beckenham Road - Solar PanelsApproved, not yet built · 290 kW
Apr 2023 6.3 km away
Rooftop solar
Biggin Hill Airport, Main Road - Solar PV ArrayBeing built · 12 MW
Oct 2023 6.3 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.