55, Parkfield Way, BR2 8AEOverhanging Lime tree - Reduce overall height by 3m and lateral branches by up to 2m, clearing branches that are rubbing on Telegraph pole and telephone wires. Remove dead wood throughout the tree. Raise the lower canopy over road to approximately 5m from ground level for clearance. SUBJECT TO TPO 751 (26.11.1991)Bromley 25/02021/TPO · All Other
May 2025 350 m away
Application Under Consideration
4, Lovelace Avenue, BR2 8DQLoft conversion with rear roof dormer, two front roof lights and construction of detached rear garden outbuilding.Bromley 25/01593/FULL6 · Householder
44, Holmcroft Way, BR2 8ADDemolition of the existing outbuilding and erection of part one/two storey rear/side extension, front porch and elevational alterations.Bromley 25/01405/FULL6 · Householder
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
120hours of spills in 2025 between them (typical neighbourhood: about 36)
31spill events counted
Thames Water
Cso At Crofton Roadinto Kyd Brook31 spills, 120 hours in 2025
44, Holmcroft Way, BR2 8ADDemolition of the existing outbuilding and erection of a single-storey rear extension of the existing houseBromley 25/01289/FULL6 · Householder
Apr 2025 350 m away
Not Required
264, Southborough Lane, BR2 8ASSingle storey rear extension, extending beyond the rear wall of the original house by 6m, for which the maximum height would be 3m, and for which the height of the eaves would be 3m (42 Day Notification for Householder Permitted Development Prior Approval)Bromley 25/01500/HHPA · Prior Approval
Apr 2025 350 m away
Approved
44, Holmcroft Way, BR2 8AD2 x overhanging Lime trees - Reduce overall height by up to 3m and lateral branches by up to 2m clearing branches that are rubbing on telephone wires & remove major deadwood throughout the canopy. Crown lift - Raise the lower canopy over the road to approximately 5m from ground level for clearance. SUBJECT TO TPO 751 (26.11.1991)Bromley 25/01652/TPO · All Other
Apr 2025 350 m away
Approved
44, Holmcroft Way, BR2 8ADHip to gable loft conversion with rear dormer and front roof light (Lawful Development Certificate Proposed)Bromley 25/01427/PLUD · All Other
Apr 2025 350 m away
Approved
44, Holmcroft Way, BR2 8ADErection of an outbuilding to rear of garden LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01426/PLUD · All Other
420, Southborough Lane, BR2 8BHDemolition of existing garage and construction of single storey side and rear extension and front porch. Hip to gable loft conversion with rear dormer with Juliet balcony.Bromley 25/00925/FULL6 · Householder
Apr 2025 400 m away
Approved
38, Homemead Road, BR2 8BADemolition of existing conservatory. Construction of single storey rear infill extension, part garage conversion, detached garden building to rear and elevational alterations.Bromley 25/00889/FULL6 · Householder
Apr 2025 400 m away
Refused
277, Southborough Lane, BR2 8BGHip to gable roof alteration to existing loft extension incorporating new front dormer and new window to side. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/00478/PLUD · All Other
Feb 2025 200 m away
Closed
62, Brookmead Avenue, BR1 2LADetails submitted to comply with the requirements of the following conditions relating to planning permission 24/03322/FULL1: Condition 3 - Existing ground levels and proposed slab levels and building heights Condition 4 - Scheme for Surface Water Drainage Condition 5 - Construction and Environmental Management Plan Condition 6 - Landscaping (soft and Hard) Condition 7 - Cycle parking details CondBromley 24/03322/CONDIT · All Other
Dec 2024 500 m away
Closed
217, Southborough Lane, BR2 8ATDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/01693/FULL1: Condition 4 - Details of the specification and performance of the kitchen extract system. Condition 5 - Details of the proposed works of sound insulation.Bromley 24/01693/CONDIT · All Other
Nov 2024 450 m away
Approved
34, Lovelace Avenue, BR2 8DQLoft conversion with side dormer including rear roof window and side rooflights. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 24/04395/PLUD · All Other
Nov 2024 500 m away
Approved
277, Southborough Lane, BR2 8BGRoof alterations to existing loft extension, addition of side and rear dormers and elevational alterations including ground floor side window.Bromley 24/04267/FULL6 · Householder
Nov 2024 200 m away
Approved
62, Brookmead Avenue, BR1 2LADemolition of garage, subdivision of plot and erection of one detached dwellinghouse with associated accesses and parking.Bromley 24/03322/FULL1 · All Other · 1 homes proposed
Sept 2024 500 m away
Approved
23, Holmcroft Way, BR2 8ADRelocation of existing outbuilding and construction of annexe outbuilding ancillary to main building, for use as living accommodation by a family member.Bromley 24/02382/FULL6 · Householder
287, Southborough Lane, BR2 8BGDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/01640/FULL6 Condition 3: LandscapingBromley 24/01640/CONDIT · All Other
Aug 2024 150 m away
Refused
283, Southborough Lane, BR2 8BGHip to gable loft conversion and extend existing front and rear dormers together with elevational alterations.Bromley 24/03007/FULL6 · Householder
Aug 2024 150 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Sedgehill Academy, Sedgehill Road - Solar PanelsApproved, not yet built · 390 kW
Nov 2025 6.7 km away
Rooftop solar
Biggin Hill Airport, Main Road - Solar PV ArrayBeing built · 12 MW
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.