New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
4net new homes in approved schemes since 2023
Application Under Consideration
109, Hayes Wood Avenue, BR2 7BQProposed two storey wrap around extension, floor plan redesign, facade alterations, outbuilding and all associated worksBromley 25/02083/FULL6 · Householder
Jun 2025 250 m away
Application Under Consideration
1, Easterbrook Place, BR2 7FAProposed roller shutter door to existing carport.Bromley 25/01833/FULL6 · Householder
Jun 2025 450 m away
Application Under Consideration
36, Glebe House Drive, BR2 7BNDetails submitted to comply with the requirements of the following conditions relating to planning permission ref: 24/04798/FULL6 Condition 3 and 4: Arboricultural Method Statement & Tree Protection Plan Condition 4: Foundations Structural DesignBromley 24/04798/CONDIT · All Other
May 2025 100 m away
Closed
133, Baston Road, BR2 7BSDetails submitted to comply with the requirements of the following conditions relating to planning permission 23/03780/OUT Condition 13 - Storage of refuse and recyclable materialsBromley 23/03780/CONDT2 · All Other
May 2025 450 m away
Application Under Consideration
9, Everard Avenue, BR2 7LRTwo storey side/rear extension part hip to gable loft conversion with rear dormer and elevational changes.Bromley 25/01147/FULL6 · Householder
May 2025 350 m away
Approved
115, Hayes Wood Avenue, BR2 7BQDemolition of existing garage and chimney and construction of single storey side/rear extension to provide annexe with elevational alterations and side extension to front porch. First floor rear infill extension and associated landscaping to rear to include patio and steps with balustrade.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
37, Hayes Wood Avenue, BR2 7BGTelephone consultation following refusal of application 24/04533/FULL6.Bromley 25/01234/PRETEL · All Other
Mar 2025 50 m away
Approved
5, Hambro Avenue, BR2 7LSAlterations to location of existing porch door with new entrance steps,ramp and driveway landscaping, elevational alterations.Bromley 25/01132/FULL6 · Householder
Mar 2025 450 m away
Approved
5, Hambro Avenue, BR2 7LSHip to gable loft conversion with rear dormer, side roof window and two front rooflights. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/01129/PLUD · All Other
Mar 2025 450 m away
Closed
83, Baston Road, BR2 7BSDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/04019/FULL1: Condition 3: Construction and Environmental Management Plan Condition 4: Hard and soft landscaping and boundary treatments Condition 5: Cycle parking Condition 6: Refuse and recycling storageBromley 24/04019/CONDIT · All Other
Mar 2025 250 m away
Closed
133, Baston Road, BR2 7BSDetails submitted to comply with the requirements of the following conditions relating to planning permission 23/03780/OUT: Condition 14 - Bicycle StorageBromley 23/03780/CONDT1 · All Other
Mar 2025 450 m away
No Objection to Proposal (OBS only)
20, Baston Road, BR2 7BET1 Ginkgo on rear left hand boundary - Dismantle to as close to ground level as possible, leaving a flat level stump.Bromley 25/00616/TREE · All Other
Feb 2025 150 m away
Approved
65, Baston Road, BR2 7BSSingle storey rear extension, rear loft extension including rear roof dormer and Juillet balcony, rear garden raised steps and elevational alterations.Bromley 25/00276/FULL6 · Householder
Feb 2025 200 m away
Application Under Consideration
Hall Rear Of 35, George Lane, BR2 7LGDetails submitted to comply with the requirements of the following conditions relating to planning permission 23/03908/FULL1: condition 3 - Surface water drainage condition 4(a) - Road condition survey Condition 5 - Construction and Environmental Management Plan Condition 6 - Slab levels Condition 7 - Landscaping Condition 8 - Refuse storage Condition 9 - Cycle storageBromley 23/03908/CONDIT · All Other
Jan 2025 400 m away
Refused
115, Hayes Wood Avenue, BR2 7BQDemolition of existing garage and chimney and construction of single storey side/rear extension to provide annexe with elevational alterations and side extension to front porch. First floor rear infill extension and associated landscaping to rear to include patio and steps with balustrade.Bromley 25/00169/FULL6 · Householder
Jan 2025 250 m away
Closed
133, Baston Road, BR2 7BSDetails submitted to comply with the requirements of the following conditions relating to planning permission 23/03780/OUT Condition 15 - Noise Assessment ReportBromley 23/03780/CONDIT · All Other
Jan 2025 450 m away
Approved
3, Easterbrook Place, BR2 7FARoller shutter door to existing front single car port.Bromley 24/04652/FULL6 · Householder
Jan 2025 450 m away
Approved
36, Glebe House Drive, BR2 7BNDemolition of existing conservatory and construction of part one/two storey rear extension with elevational alterations.Bromley 24/04798/FULL6 · Householder
Dec 2024 100 m away
Refused
37, Hayes Wood Avenue, BR2 7BGTwo storey front/side extension, hipped to gable loft conversion including rear roof dormer, one front and side roof light and elevational alterations.Bromley 24/04533/FULL6 · Householder
Dec 2024 50 m away
No Objection to Proposal (OBS only)
Old Rectory Gardens, Hayes StreetT1 Common Lime obscuring road sign - Remove basal/epicormic growth on pavement side. T2 Yew - Crown lift to provide 4m clearance from ground level. G3 Yew/Sycamore group - Reduce all overhanging growth back to boundary.Bromley 24/04337/TREE · All Other
Nov 2024 100 m away
Approved
83, Baston Road, BR2 7BSChange of use from Use Class E (pre-school) to Use Class C3 to form two residential units, with associated works including the removal of the garden room and alterations to windows and doorsBromley 24/04019/FULL1 · All Other · 2 homes proposed
Nov 2024 450 m away
Approved
91, Hayes Wood Avenue, BR2 7BQTwo-storey front/side extension, conversion of roof space to provide habitable accommodation including hip to gable, increase in ridge height, rear dormer extension, front and side rooflights and elevational alterations.Bromley 24/03952/FULL6 · Householder
Oct 2024 150 m away
No Objection to Proposal (OBS only)
2, Redgate Drive, BR2 7BTLime trees, conifer trees and hedges located at 2 Redgate Drive and 54 Baston Road, overhanging 52A Baston Road - Reduce overhang to boundary.Bromley 24/03793/TREE · All Other
Oct 2024 500 m away
Approved
13, Everard Avenue, BR2 7LRDemolition of existing rear extension and detached garage. Construction of single storey rear/side extension, front porch and detached garden building to rear.Bromley 24/03720/FULL6 · Householder
Oct 2024 350 m away
Approved
40, Hayes Wood Avenue, BR2 7BLLoft conversion with installation of 3 rooflights in side roof slope PROPOSED LAWFUL DEVELOPMENT CERTIFICATEBromley 24/03490/PLUD · All Other
Sept 2024 50 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Downham Health & Leisure Centre, Moorside Road - Solar PanelsApproved, not yet built · 230 kW
Mar 2025 5.6 km away
Rooftop solar
Trinity School Of John Whitgift, Shirley Road - Solar PanelsApproved, not yet built
Apr 2023 5.7 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Dams and Reservoirs · From Mogden Sewage Treatment Works to the River Thames upstream of Teddington Weir
application due March 2027 26.4 km away
Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.