Within 2 km, around Bromley South in Bromley. Building, planning, schools, transport, prices and crime.
111new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-4.1%like-for-like prices in Bromley South, 2024 → 2025 (council +1.6%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026 400 m away
New homes
7 new homes completedflats · Apr 2026
Apr 2026 800 m away
New homes
7 new homes completedflats · Nov 2025
Nov 2025 900 m away
New homes
6 new homes completedflats · Jul 2025
Jul 2025 1.2 km away
New homes
8 new homes completedflats · Jul 2025
Jul 2025 450 m away
School closed
School closed: Bishop Challoner SchoolOther independent school, other independent school (closure)
Jul 2025 1.4 km away
New homes
5 new homes completedflats · May 2025
May 2025 1.8 km away
New homes
52 new homes completedflats · Jan 2025
Jan 2025 900 m away
School closed
School closed: Ashgrove School LtdOther independent school, other independent school (closure)
Jul 2023 1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
0applications in the last 12 months
0approved · 0 refused
0still being decided
15net new homes in approved schemes since 2023
Application Under Consideration
46, Hayes Road, BR2 9AADemolition of existing conservatory and dormer and erection of single storey rear extension and dormer extension, to include ancillary worksBromley 25/02066/FULL6 · Householder
19, Elizabeth Wheeler House, Flat 29, The Mall, BR1 1TTRemoval of existing aluminium single glazed sliding windows and insertion of new triple glazed units to match existing configuration with tilt & turn opening lightsBromley 25/01491/FULL1 · All Other
May 2025 350 m away
Withdrawn
35, Sandford Road, BR2 9AL35 Sandford Road DOCBromley 24/00219/CONDT1 · All Other
May 2025 500 m away
Approved
35, Sandford Road, BR2 9ALMinor material amendment under Section 73 of the Town and Country Planning Act 1990 to planning permission reference 24/00219/FULL1 for the demolition of Nos.35 and 37 Sandford Road and the erection of 6 new dwellinghouses comprising 3 pairs of semi-detached dwellings with associated vehicular access, car parking, cycle parking and landscaping, in order to vary condition 2 to allow for changes toBromley 24/00219/RECON · All Other
Apr 2025 500 m away
Approved
37, Whitehaven Close, BR2 0YAG1 Limes x 10 on rear left hand boundary - Cut back a selection of branches overhanging the car park area and remove major deadwood. Cut back the established ivy on the Sycamore. T4 Sycamore at rear of flats overhanging neighbouring property - Reduce the height and radial spread of the canopy by up to 1.5m, maintaining a natural shape and remove major deadwood, split and hanging branches. SUBJECT
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
19, Prospects House, Elmfield Road, BR1 1LTDetails submitted to comply with the requirements of the following conditions relating to planning permission 20/04296/FULL1: Condition 28 - Air Quality Mitigation StatementBromley 20/04296/COND26 · All Other
Mar 2025 400 m away
Approved
10, Varney Court, St Mark's Square, BR2 9YDTo replace the cladding material on the internal balconies of Varney Court, Brouard Court and Dewey Court in regards to the fire load of the building PROPOSED LAWFUL DEVELOPMENT CERTIFICATEBromley 25/01040/PLUD · All Other
Mar 2025 100 m away
Approved
8, D'arcy Place, BR2 0RYSingle storey rear extension and new rear patio with raised steps (RETROSPECTIVE APPLICATION).Bromley 25/00997/FULL6 · Householder
Mar 2025 500 m away
Refused
46, Hayes Road, BR2 9AADemolition of existing conservatory, side garage and dormer and erection of single storey rear extension, two storey side extension, dormer extension and main house roof extensionBromley 25/00716/FULL6 · Householder
Mar 2025 500 m away
Approved
6, Pinewood Road, BR2 9ADProposed garden studio to rear of gardenBromley 25/01283/FULL6 · Householder
Mar 2025 400 m away
Closed
35, Sandford Road, BR2 9ALDetails submitted to comply with the requirements of the following conditions relating to planning permission 24/00219/FULL1: Condition 4 - Construction and Environmental Management Plan Condition 6 - External Materials Condition 9 - Swift Bricks Condition 12 - Electrical Vehicle Charging DetailsBromley 24/00219/CONDIT · All Other
Mar 2025 500 m away
Refused
123, Queen Anne Avenue, BR2 0SHChange of use of the property from Class C3 to C4 LAWFUL DEVELOPMENT CERTIFICATE (EXISTING)Bromley 25/00747/ELUD · All Other
Mar 2025 400 m away
Approved
23, Westmoreland Place, BR1 1DSMinor Material Amendment under Section 73 of the Town and Country Planning Act 1990 for the variation of condition 4 of planning permission 97/02292/FUL (granted for the change of use from retail (Class A1) to the sale of food and drink for consumption on the premises and/or of hot food for consumption off the premises (Class A3)) in order to allow an extension of opening hours to 08:00hrs to 00:3Bromley 97/02292/RECON1 · All Other
Mar 2025 200 m away
Approved
5, Durham Avenue, BR2 0QASingle storey rear extension, hipped to gable roof alterations, rear dormer, solar panels to rear, one side rooflight and elevational alterations. LAWFUL DEVELOPMENT CERTIFICATE (PROPOSED)Bromley 25/00692/PLUD · All Other
Feb 2025 400 m away
Approved
5, Durham Avenue, BR2 0QAProposed front dormer.Bromley 25/00691/FULL6 · Householder
Feb 2025 400 m away
Refused
34, The Mall, BR1 1TSChange of use of the first and second floors of 32 and 34 The Mall, and 73 and 75 The High Street from Class E (Commercial, Business and Service) to Class C3 (Dwellinghouses) to form 14 residential units (56 day application for prior approval in respect of transport and highways impacts, contamination risks, flood risk, noise impacts, character or sustainability of a conservation area, provision oBromley 25/00498/CUETC3 · All Other · 14 homes proposed
Feb 2025 350 m away
Closed
97, High Street, BR1 1JQDetails submitted to comply with the requirements of the following conditions relating to planning permission 23/01490/CUETC3 Condition 3 Wall and Floor Specifications Condition 4 Bin Store Details Condition 5 Bike Store DetailsBromley 23/01490/CONDT1 · All Other
Feb 2025 400 m away
Application Under Consideration
2, Bromley Civic Centre Churchill Court, Westmoreland Road, BR1 1ASConsultation on Conservation Area Appraisals and Management Plans for Shortlands Village, Bromley Town Centre, The Covert, The Thrifts and Chislehurst Road.Westminster 25/00992/OBS · All Other
Feb 2025 200 m away
Refused
8, Marina Close, BR2 0XPConstruction of detached two storey 3 bedroom dwelling on land adjacent to 8 Marina Close with associated cycle and refuse storage, landscaping and parking, including formation of vehicular access.Bromley 25/00245/FULL1 · All Other · 1 homes proposed
Feb 2025 300 m away
Approved
49, High Street, BR1 1LEInstallation of retractable fabric awning with logo advertisement over front entrance of premises.Bromley 24/04485/ADV · All Other
Feb 2025 300 m away
Closed
62, Unit 2, High Street, BR1 1EGDetails submitted to comply with the requirements of the following conditions relating to planning permission 22/03042/FULL1: Conditions 3 & 10 - Operative and Construction Vehicle ProvisionBromley 22/03042/CONDT2 · All Other
Jan 2025 250 m away
Approved
113, High Street, BR1 1JQChange of use of vacant commercial premises from Class E Use (Commercial, Business and Service) to Sui Generis Use for mixed restaurant and hot food takeaway use, incorporating alterations to shopfront to provide replacement door to front elevation and LED strip lighting surround, and associated plant equipmentBromley 25/00198/FULL1 · All Other
Jan 2025 450 m away
Withdrawn
8, Masons Hill, BR2 9EYFormation of excavation holes to investigate subsidence to north elevation. LISTED BUILDING CONSENTBromley 25/00055/LBC · All Other
Jan 2025 350 m away
Approved
113, High Street, BR1 1JQReplacement internally illuminated fascia sign, internally illuminated fascia lettering and internally illuminated projecting sign.Bromley 25/00200/ADV · All Other
Jan 2025 450 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
John Ruskin Sixth form College, Selsdon Park Road - Solar PanelsApproved, not yet built · 340 kW
May 2026 6.5 km away
Rooftop solar
David Lloyd Leisure Limited, Corner Of Weigall Road - Solar PanelsApproved, not yet built · 210 kW
Sept 2023 6.7 km away
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 550 m away
Standard
Elvington Green, BromleyNew service connection · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Nov 2026 850 m away
Minor
Winchester Road, ShortlandsUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 500 m away
Minor
St Mary'S Avenue, ShortlandsUtility asset works · THAMES WATER · No carriageway incursion
Dec 2026 to Dec 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 26.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.